Mitchell Architects email header2
Award winning fire station design, planning and construction services
Welcome to Mitchell Associates Architects

 

Greetings! 
  

The Slingerlands Fire Department breaks ground; Voters approve East Putnam fire station; The FIERO design symposium is approaching; We've added several recent projects and other updates to our website.

Slingerlands Fire Station Breaks Ground

 

Renovations and additions to the Slingerlands Fire Station have begun! The 1960's vintage station is getting two new bays, lengthening of the existing 3 bays, firematic support spaces and a day room.

Before shot: Slingerlands Before
 The Groundbreaking Ceremony: Slingerlands ground break

 The future station:

Slingerlands Model
Slingerlands Model

 

East Putnam Fire Station Project Moves Ahead

 

After an effective public education program, the East Putnam Fire District of Putnam, Connecticut has recieved a resounding vote of approval from the community with more than 80% of the voters voting in favor of the project.  Construction documents are nearing completion, and the job will go to bid in late winter. The District will be utilizing funds from the U.S. Department of Agriculture to build their new station. Here's a rendering of the proposed design. 

 

East Putnam Rendering  

 

FIERO Fire Station Design Symposium

 

We will be presenting, once again, at the F.I.E.R.O. Fire Station Design Symposium this November in Charlotte, North Carolina. The title of Bob's talk is "Construction Documents through Punch List: How to Control the Process for a Design/Bid/Build Project".  This presentation will provide the participant an overview understanding of how to control the outcome of a construction project, including:

 

 Construction Documents

  • How to create a thorough set of drawings and specifications that protect and control the project
  • Examples of particular elements of the drawings and specifications that control the construction process
  • What constitutes a proper detailed estimate of probable construction cost
  • The use and meaning of "Or Equal"
  • The goals of building in alternates
  • Contingencies 

Bidding

  • Maximizing the number of bidders
  • Allowing the bidders to be confident enough to submit a very competitive number
  • Addenda
  • Evaluating the bidders 

Construction

  • How to control the project to have the building properly built on time and on budget
  • The role of submittals and testing
  • The purpose and power of RFI's, meeting minutes, CO's and pay requisitions
  • Change orders
  • The punch list

Click the logo below to visit the F.I.E.R.O. website for more details about the symposium.

 

FIERO art

 

  

We've added several updates to our website. Please check out our most recent projects and studies, as well as the new page of testimonials.

Mitchell Architects email header2 
 
  
 Cortland Image A
 
 
Want to See More?
Click here to check out our web site


 

 IAFC COver


Holden Training 1









Holden Main View