|
|
Argo Tea has been keeping the Creative Surfaces design and production teams busy. This Argo Tea project took us to the Woodfield Mall in Schaumburg, IL during the Fall of 2013.
This project was different from the other Argo Tea projects we designed and built in that several areas of the cabinetry we finished the cabinets with a painted finish. This project included a Teaosk front counter and back cabinets, teapot display, glass display case,
|
|
|
|
|
Brand New Hilton Garden Inn built in Downtown Sioux Falls
|
The Sioux Falls skyline has changed and the addition of the new Hilton Garden Inn along the Big Sioux River is a contributing factor. Book a room and rest assured you're going to enjoy your stay at this beautiful new hotel in town. The custom hotel millwork was designed and manufactured by the talented and skilled craftsmen here at Creative Surfaces, and we are quite proud of the finished product.
|
|
|
|
|
|
One of our niches at Creative Surfaces is fitness centers - each club is unique in design, materials, and functionality. This allows our design team to utilize products and colors that separate one club from another which you will find at Edge Fitness in Las Vegas, Nevada.
This custom designed and built cabinetry involves a fitness center reception desk with built in retail shelving. The four sided half wall desk and cabinets is built using Wilsonart plastic laminate "Cosmic Strandz" with Chemetal "Aluminum Placid Sky" accent panels on the..
|
|
|
|
|
|
Creative Surfaces has been very fortunate to work with Lewis Drug Stores over the past several years. Some of the projects have been new construction; however Lewis Drug is also in the process of remodeling many of their existing locations. Creative Surfaces has been helping them achieve their new look with custom built commercial cabinetry in the pharmacy area, cash wrap counters, and interior signage.
Fall of 2013 took Creative Surfaces install team to the County Fair Lewis Drug in Dell Rapids, SD.
|
|
|
|
|
|
|
|
Copyright �2013. All Rights Reserved.
|
|
|
|
|
If you don't follow us on our facebook or
twitter pages, you should! Here's some updates on our Creative construction projects. The paint booth is almost finished. Just have some final inspections & such to pass first. The tunnel is awesome, however not complete just yet. The south end of the 'connection addition' needs to be completed yet, so it is UNOFFICIALLY open for the time being. In other words, the entrances get boarded up at night. Just yesterday, they began digging up the north....
|
|
| |