tekmos logo
Like us on FacebookFollow us on TwitterView our profile on LinkedInVisit our blog
Tekmos Talks Happy New Year! 
A Newsletter for the Semiconductor Industry

Like us on FacebookFind us on Google+ Visit our blog
January  2013
In This Issue
From the Desk of the President
Tekmos Product Development
Tekmos Quality
Join Our Mailing List!
Quick Links

Applications for Tekmos Products:
  • Automotive
  • Industrial
  • Military
  • Medical
  • Telecommunications 
    

Greetings!
Happy New Year Austin, TX
Happy New Year from Austin, TX

Happy New Year & welcome to Tekmos Talks January 2013!  This month's newsletter will share Tekmos' New Year's Resolutions and "Jumping Through Hoops" on reducing a gate array prototype cycle .

Our High Temperature ASIC and High Temperature Micros 175/250C are still the hottest in the world!

 

From the Desk of the President
LReed
Lynn Reed, President
 "Jumping Through Hoops" 

 

A normal gate array prototype cycle takes about 8 weeks.  There is a week to make masks, 3 weeks for wafer processing, another 2 weeks for assembly, a week for test and bake, and a final week that taken by shipping between the various stages.

 

Sometimes, 8 weeks is too long, particularly if a customer faces a lines-down situation.  In these cases, expedites can help to reduce the total cycle to under 3 weeks.

 

The first part of an expedite is to pay the wafer fab to turn the lot into a hot lot (or bullet lot).  This will reduce the fab and mask time from 4 weeks to about 10 days. 

 

Expediting the assembly is more complicated.  Most overseas manufacturers are pretty efficient, and an expedite will reduce their cycle time from two weeks to about 1 week.  This is dependent on their capacity at any given time.

 

Domestic assemblers are an option, but they must have the tooling for the specific package you need.  With expedites, that can usually turn a package in 2 to 3 days.  And there is an additional time savings to be had from the reduced shipping times.

 

Another option is to use a "glob-top" approach.  This involves taking an existing package, cutting a hold in it, and removing the original die.  The new die is put into the cavity and bonded.  Then it is covered with plastic, resulting in a package that is physically identical to the original.  There are potential reliability issues, so glob-tops are only for engineering prototypes.  Either approach will deliver assembled parts in about 3 days.

 

Another 2 days can be saved by eliminating bake if the customer plans to either use a socket, or to hand solder the part on the board.

 

When all of this is taken together, expedites can reduce the cycle time down to a little over 2.5 weeks.

 

I should note that an expedite charge covers a best effort, and is not a guarantee of ultimate performance.  Still, it had a very high probability of delivering parts in a third of the normal cycle time.

 

For more information... 

 

 

Tekmos Product Development New Year Resolutions
2013

The New Year is the time for New Year's resolutions.  One of the fun things about being president is that I get to make the New Year's resolutions for everyone else.  And here they are:

  

 

  • Bring out the user programmable versions of our 68XX family.  We have the ROM and ROMless versions, and now we will add flash.  This will include the 68HC05B and C, and the 68HC11D, E, and K families.
  • Expand our high temperature offerings by incorporating ceramic packaging. 
  • Work on improving NVM performance at 175C.
  • Bring out 0.18 micron ASICs
  • Expand our Japanese sales.
    Tekmos Product page...

 

 

Tekmos Quality New Year Resolutions
new year money
  • Complete the AEC-Q100 product qualification studies on our 68XX families.
  • Study oxide integrity at 175C.
  • Set-up an ongoing reliability monitor.

  

Manufacturing New Year Resolutions

  

  •          Develop an alternative for the PLCC 52 package.
  •          Add a wafer probe capability.
  •          Add a lead scan capability.
  •          Add a high temperature test capability.
  •  

Welcome to 2013 we look forward to another exciting year! Thank you for reading Tekmos Talks, please share it with colleagues. Contact Bob Abrams, Vice President of Sales & Business Development, call (512) 342-9871 or email Sales for more information on our most recent "tape outs", our high temperature ASIC, or our other quality products, and, of course our New Year Resolutions.

We appreciate our customer loyalty. Tekmos is looking back while innovating for tomorrow.

 

Sincerely,

 

Lynn Reed, President
Tekmos
4120 Commercial Center Drive, Suite 400
Austin, TX 78744
Phone: (512) 342-9871
Fax: (512) 342-9873
Email:  Sales@Tekmos.com