EL Newswire Masthead
SurgePure - A Surge Protector That Won't Wear Out!

Follow us on Twitter                      March 5, 2014
In the Spotlight 
Energy and cost reduction opportunities are there. FIND THEM. It just got easier with the New Fluke 1730 Energy Meter.
Industry News

Canadian Electricity Association Calls for Action on Copper Theft - The Canadian Electricity Association (CEA) released a policy paper that draws attention to the impacts of copper theft from electricity infrastructure and outlines four key recommendations to deter copper theft in Canada. Read more... 


Continued Positive Reliability Outlook for Ontario's Electricity System - The latest IESO 18-Month Outlook report anticipates adequate resources to meet demand throughout the summer of 2014. Approximately 3,100 MW of new generation is expected to come online - almost all of it transmission-connected renewable generation. Read more...

Wireless Charging Systems for EVs Will Surpass 300,000 in Annual Sales by 2022 Wireless charging systems for electric vehicles offer several advantages over plug-in technology. According to Navigant Research, worldwide sales of wireless EV charging systems will grow from a few hundred in 2014 to nearly 302,000 by 2022. Read more... 

Solar Tech Talk - Solar-Battery Banks & the Off-Grid Cabin or Cottage

Solar Battery Banks and the Off-Grid Cabin or Cottage - The most important part of choosing a solar battery bank is gathering load profile information from the customer. Once you have the estimated solar battery banks capacity required, a choice has to be made. There are many different types of batteries to choose from and... Read more...

Innergex Begins Commercial Operation of the 17.5 MW Northwest Stave River Hydro Facility - Construction of the 17.5 MW Northwest Stave River hydroelectric facility, located on Crown land approximately 50 km north of Mission, B.C., began in 2011 and was completed in early December 2013 - on time and on budget. Read more...    
 

Manitoba Hydro and Great River Energy Announce 600 MW Power Sale MOU 

Manitoba Hydro and Great River Energy have signed an MOU to jointly investigate the sale of up to 600 MW of electricity from Manitoba Hydro to Great River Energy, commencing in approximately 2020. Read more...  

 

Innergex Announces the Start of Operation of the 49.9 MW Kwoiek Creek Hydro Facility - Kwoiek Creek's average annual production is estimated to reach 223,400 MWh, enough to power more than 20,000 BC households. Read more... 
Keeping Current
 
Eaton Appoints Shelly Woods Manager, Project Management and Customer Service

Gescan Ontario is Now an Authorized Reseller for GE Digital Energy

Terry Becker Achieves New NFPA CESCP Designation

Product Safety Alerts!

UL Warns of Counterfeit UL Mark on Photovoltaic Panels (Release 14PN-02)


UL Warns of Counterfeit UL Mark on Emergency Lighting Inverters (13PN-32)


Product Showcase 

Eaton's New EV Cord Connected Home Charger
Eaton's New EV Cord Connected Home Charger

Eaton is expanding its EV Charging Station product line and now offers a prewired, cord connected EV Charging Station that includes a Cooper NEMA 6-50 receptacle, plug, and weatherproof cover in the box. With its rugged stainless steel construction, the Eaton Level 2, 16A & 30Amp wall mount EV charger is rated Type 3R for both indoor and outdoor use. The charger comes with Eaton's cord management system which helps protect the SAE J1772™ connector while providing safe, reliable, and fast charging for all types of electric vehicles.  Learn more...  
 



Exterior VAPOR BOXES Protect Against Air Infiltration, Meet Article 402.4 of the ICC and Help Obtain Energy Star Rating - Designed for new construction, Arlington's non-metallic FR series device and fixture VAPOR BOXES mount directly to a flat EXTERIOR surface without the need to cut an oversized hole in the substrate. Read more...

KleinŽ Tools Introduces Its VDV Cushion-Grip Impact Punchdown Tool - Klein Tools expands its innovative Voice/Data/Video punchdown tool line with a new Cushion-Grip Impact Punchdown Tool and Blade. Read more...

Current Issue January/February
Volume 20, Number 1

January/February 2014
Valard - Home to the largest power line workforce in Canada
2013 Electrical Line Media Planner
2014 Media Planner
Events
Calendar

2014 Electrical Learning EXPO

Edmonton, AB
March 19, 2014 

CEATI 2014 Circuit Breaker Test & Maintenance Workshop
Palm Desert, California
March 19-20, 2014

All-Energy
Canada 2014

Toronto, ON
April 9-10, 2014

Future Building 2014

Burlington, ON

April 10, 2014

MEET 2014
Moncton, NB
May 7-8, 2014
    
 
 MORE EVENTS  
 
SIGN UP NOW
and start receiving
EL NEWSWIRE
twice monthly
!

Join Our Mailing List
Homepage  l  EL Newswire Archive  l  About Electrical Line  l  Contact Us  l  Follow Us On Twitter  Follow us on Twitter
You have received this email because you have an existing business relationship with Electrical Line Magazine. Periodically, we may inform you of new products and special offers from third party mailers that we believe will be helpful in your business or career. Your email address has NOT and will NOT be given to any third parties. If you do not wish to be contacted with these offers via email, please use the SafeUnsubscribeŽ link at the bottom of the page to opt-out of all or specific promotional material.