Website Banner
Week 28 Quality Report



White Horse Laboratories has been publishing our Weekly Quality Reports since 2009, which are a listing of the devices that have had over 5% lot failure in electrical testing or the buyer has rejected the lot following results of inspection methods

While this list does not imply that the balance of devices within a lot are defective, and is not exhaustive (for example, a 5% failure rate may be too high or some buyers may accept devices in a physical condition that others would not), it is intended to an indicator as to what is going on in the market and is a reminder to be aware of the risks of sourcing without adequate quality control measures in place.

Week 28 

Inspection Accept 

79%

 

Electrical Testing Pass

79%

This Week in The Lab...

                                   
White Horse Laboratories' Quality Report

Week 28 Quality Report

Substandard Parts List
                           

Lattice GAL16V8D-15LD/883 (Date Code 1013) - 14% Failure Rate - ID and program writing failure.


Xilinx XC4VLX60-11FFG668C (Date Code 1441) - 5% Failure Rate - Program error. 

 

Maxim MAX1247BEEE (Date Code 1216) - 100% Failure Rate - Reading "0XFE0" at full, half, and zero scale.

 

Analog Devices OP207AY (Date Code 0041) - 10% Failure Rate - No output on one or both channels (see below). 

 

OP207AY Output Voltage Failure (blue and green lines are output voltage, blue line shows no output).
                                                      
Weekly Report Archives
Tune in thru WeChat
Follow Us on WeChat
Substandard Parts Lists dating back to 2009


White Horse has been publishing Weekly Quality Reports since 2009. Now we open those archives to you.

 

Simply click on the Weekly Quality Report page on our website and then click the "View our Archive" button to see each posting from 2009 thru 2015.


We hope you find this report informative and usefull for your organization.

 

All the best,

Mark A. Rinehart
White Horse Laboratories
Notes:

1. Statistics are calculated as a percentage of all lots dis-positioned within the given time period.

2. "Accept" is defined as customer acceptance of report device condition.

3. "Pass" is defined as meeting electrical parameters defined by the agreed upon test plan.