Website Banner
Week 21 Quality Report



Since 2009, White Horse Laboratories has been publishing our Weekly Quality Reports, which is a listing of the devices that have had over 5% lot failure in electrical testing or the buyer has rejected the lot following results of inspection methods

While this list is not exhaustive (for example, a 5% failure rate may be too high or some buyers may accept devices in a physical condition that others would not), it is intended to an indicator as to what is going on in the market and is a reminder to be aware of the risks of sourcing without adequate quality control measures in place.

Week 21 

Inspection Accept 

74%

 

Electrical Testing Pass

79%

This Week in The Lab...

                                   
White Horse Laboratories' Quality Report

Week 21 Quality Report

Substandard Parts List
                           

Vishay 1.5KE68CA (Date Code 1440) - 13% Failure Rate - High Vbr, breakdown voltage.

 

Murata LQW18ANR27G00D (Date Codes 1312 and 1407) - 67% Failure Rate - High inductance and DC resistance, consistent with a different part number.

 

Samsung S3C4510B01-QE80 (Date Code 1115) - 7% Failure Rate - Open and shorted pins, broken protection diodes, and broken pins.

 

Xilinx XC9572-15PQ100C (Date Codes 0017, 0021, 0033, 0037, 0045, 0049, 0113, and 0145) - 17% Failure Rate - Program error and no output.

 

Samsung S3C4510B01-QE80 Open and Shorted Pins with Broken Protection Diode Failures
                                                      
Weekly Report Archives
Tune in thru WeChat
Follow Us on WeChat
Substandard Parts Lists dating back to 2009 Now Available


White Horse has been publishing Weekly Quality Reports since 2009. Now we open those archives to you.

 

Simply click on the Weekly Quality Report page on our website and then click the "View our Archive" button to see each posting from 2009 thru 2015.


We hope you find this report informative and usefull for your organization.

 

All the best,

Mark A. Rinehart
White Horse Laboratories
Notes:

1. Statistics are calculated as a percentage of all lots dis-positioned within the given time period.

2. "Accept" is defined as customer acceptance of report device condition.

3. "Pass" is defined as meeting electrical parameters defined by the agreed upon test plan.