Week 10 Report

 

Inspection Accept

78%

 

Electrical Testing Pass

42%

This Week in The Lab...

                                   
White Horse Laboratories' Quality Report

Week 10 Summary                                                                        

 

Week 10 saw the return of fairly normal operations as the supply chain got back into motion following the holiday break, and the weekly statistics are more valid with regular volumes.

 

That being said, we saw the first plunge of the year for Electrical Testing yields, falling to 42% in Week 10 after climbing in Weeks 2-9 to 100%. Inspection yields; however, recovered to 78% in Week 10 after falling to just 33% in Week 9, just the second but also the lowest, rating in the young year. 

 

Seven part numbers have been added to the Substandard Parts List this week, two of which had a 100% failure rate (which were submitted for Failure Analysis).

Week 10 Quality Report

 
Substandard Parts List
                           

Intel EN80C188EB-13 (Date Code 811) - 29% Failure Rate - Pins 3 and 60 are Connect and should be Non-Connect.

 

NXP Semiconductor LPC2136FBD64/01.15 (Date Code not marked or labeled) - 100% Failure Rate - Blank-check error and cannot be erased.

 

Renesas M51995AFPCF0J (Date Code not marked or labeled) - 100% Failure Rate - No output oscillation at Vcc=18V.

 

Xilinx SC4025E-4PG299I (Date Codes 0017, 0036, and 0042) - 13% Failure Rate - Program error and no output.

 

Freescale MRF9030L (Date Code not marked or labeled) - 21% Failure Rate - Open-circuit.

 

Freescale MRF9060L (Date Code not marked or labeled) - 11% Failure Rate - Open-circuit, short-circuit, and high leakage current.

 

Xilinx XC4VLX25-10SF363I (Date Codes 1027, 1035, and 1043) - 85% Failure Rate - Program error with VccINT shorted to GND and wrong ID code.

Renesas M51995AFPCF0J - No output oscillation at Vcc=18V.
                                                      
Notes:

1. Statistics are calculated as a percentage of all lots dis-positioned within the given time period.

2. "Accept" is defined as customer acceptance of report device condition.

3. "Pass" is defined as meeting electrical parameters defined by the agreed upon test plan.

We hope you find this report informative and usefull for your organization.

 

All the best,

Mark A. Rinehart
White Horse Laboratories