Week 3 Report

 

Inspection Accept

47%

 

Electrical Testing Pass

75%

This Week in The Lab...
Holiday Reminder
Week 3 Summary
Substandard Part Listing
                                         
                                   

Chinese New Year Schedule Reminder
2014 - The Year of the Horse

Our China facilities be closed on January 31 through February 9, returning on Monday, February 10th. 

 

Our Hong Kong operation will be closed on January 31 through February 3, returning on Tuesday, February 4th.

 

Please note, as the actual first day of the three-day festival is on the 31st, many people leave several days in advance to be home for the first day of the holiday, and many need to leave days before that in order to secure tickets (which are obviously in short demand when millions are travelling at the same time).

 

Most of the markets in Shenzhen close on the 24th, this Friday. We need to ship from the lab on the 29th in order to get to Hong Kong on the 30th for final shipment as Hong Kong is closed on the 31st. 

                            
White Horse Laboratories' Quality Report

Week 3 Summary                                                                        

 

Electrical Testing yields dipped back to 75% in Week 3 after reaching 86% in Week 2 of 2014.

 

Inspection yields also regressed to 47% in Week 3 after climbing to 61% to in Week 2.

 

There were four lots with higher than a 5% failure rate, one of which was 100%.

Week 3 Quality Report

 

Substandard Part Listing

 

Sipex SP3077EEN-L/TR (Date Code not marked or labeled) - 100% Failure Rate - Low driver differential output voltage.

 

Maxim DS1267-010  (Date codes 0005, 0013, 0028, and 0042) - 16% Failure Rate - High resistance.

 

Xilinx XC6VLX240T-1FFG1156C (Date Code 1225) - 14% Failure Rate - Program error.

 

Xilinx XC2VP20-6FF1152I (Date Code 1229;1224 and 1237) - 14% Failure Rate - Program error and no output.

Sipex SP3077EEN-L - Low driver differential output voltage
Notes:

1. Statistics are calculated as a percentage of all lots dis-positioned within the given time period.

2. "Accept" is defined as customer acceptance of report device condition.

3. "Pass" is defined as meeting electrical parameters defined by the agreed upon test plan.

We hope you find this report informative and usefull for your organization.

 

All the best,

Mark A. Rinehart
White Horse Laboratories