Website Banner

Weeks 23-24 Report

 

Inspection Accept

69%

 

Electrical Testing Pass

53%

This Week in The Lab...
Weeks 21-22 Summary
Substandard Part Listing
week 23&24                         
                                   
White Horse Laboratories' Quality Report
Weeks 23-24, 2013

Weeks 23-24 Summary                                                                                                          

  

Electrical Testing continued its slow and steady decline, dropping to its third lowest count for the year at 51% in Week 24, despite an upward blip to 55% in Week 23, averaging 53% for the period, down from the prior period's 56%.

 

Eight different devices which had a high failure rate in Electrical Testing, and two of those had a 100% failure rate.

 

Inspection results had a significantly better period, reaching up to 79% in Week 23 before crashing back down to 58% in Week 24, averaging 69% for the period. That is 6 points up from the previous period, but bitter-sweet with the high and low extremes.

Weeks 23-24 Quality Report

remarked
Remarked STW18NK80Z with 100% Failure Rate

 

Substandard Part Listing

 

STMicroelectronics STW18NK80Z(Date Code 219) - 100% Failure Rate - High Rds(on).

 

Microsemi JAN2N2326 (Date Code 516) - 12% Failure Rate - High Idrm and Irrm.

 

Panasonic DS4E-S-DC24V (Date Code not marked or labeled) - 64% Failure Rate - Low coil resistance.

 

Vishay 2N5564 (Date Code not marked or labeled) -100% Failure Rate - The devices are not JFET pairs and there is an extra diode between pins 3 and 1 and also between pins 4 and 6.

  

Xilinx XC2S300E-6FTG256C (Date Code 1108) - 17% Failure Rate - Program error.

 

Atmel AT29C020-90PC (Date Codes 0429 and 0441) - 13% Failure Rate - ID check, program verify error and poor contact pins.

 

Ali M6117D (Date Codes 0703, 0711, 0725 and 0737) - 7% Failure Rate - Open, shorted pins and bad protective diodes.

   

Atmel AT24C08BN-SH-T (Date Code not marked or labeled) - 14% Failure Rate - Program & verify error.

Notes:

1. Statistics are calculated as a percentage of all lots dis-positioned within the given time period.

2. "Accept" is defined as customer acceptance of report device condition.

3. "Pass" is defined as meeting electrical parameters defined by the agreed upon test plan.

We hope you find this report informative and usefull for your organization.

 

All the best,

Mark A. Rinehart
White Horse Laboratories