Website Banner

Week 2 Report

 

Inspection Accept

67%

 

Electrical Testing Pass

75%

Week 2 of 2013          
                                   
White Horse Laboratories' Quality Report
Week 2, 2013

Week 1 Summary                                                                                                          

  

The second week of 2013 resulted like much of 2012 with Inspection and Testing yields going in opposite directions.

 

Inspection yields climbed to 67% in Week 2 from 56% in Week 1, the second straight week of gains. Electrical Testing, however, dipped to 75% from Week 1's 79% lot acceptance rate.

Training Seminar
Industry Terminology & Standards

January 21st's training seminar on international standars including CCAP-101, AS5553, and AS6081 standards was attended by more than 30 representatives from 15 different companies. The next event is being scheduled for April, so stay tuned for the schedule to make sure you don't miss out.
Huaqiang Square Hotel, January 21
Huaqiang Square Hotel
Shenzhen, China 
January 21, 2013
2:00PM-4:00PM

Week 2 Quality Report

Substandard Part Listing
 

LT1490IS8#PBF Failure
LT1490IS8#PBF Incorrect Ouputs
Linear Technology LT1490IS8#PBF (Date Code 0921) - 100% Failure Rate - Low and inconsistent outputs.
  
Texas Instruments TPS5450DDAR (Date Code not marked or labeled) - 100% Failure Rate
- Short circuits and no output.
  
ON Semiconductor SZ1SMA5935BT3G (Date Code 238) - 54% Failure Rate - High Vz.
  
Xilinx XC4005E-4PQ100I (Date Code 1041) - 7% Failure Rate - Bitstream data could not be loaded through PROM or JTAG.
  
Notes:

1. Statistics are calculated as a percentage of all lots dis-positioned within the given time period.

2. "Accept" is defined as customer acceptance of report device condition.

3. "Pass" is defined as meeting electrical parameters defined by the agreed upon test plan.

We hope you find this report informative and usefull for your organization.

 

All the best,

Mark A. Rinehart
White Horse Laboratories