Week 42 Report

 

Inspection:
 
70% Accept

 

Testing

64.7% Pass

Week 42 chart                                

 

 Electronica - Munich, Germany - November 13-16

Electronica 2012
Come Visit us at Hall A4, Booth 142
White Horse Laboratories' Quality Report
Week 42, 2012

Weeks 42 Summary 

  

Inspection results dropped back down to 70% in Week 42 after reading 76.7% buyer acceptance in Week 41. Remarked and resurfaced parts continue to plague buyers.

 

Electrical testing yields also dipped in Week 42, dropping over 20 full points from 85% in Week 41 to 64.7% in Week 42.

Week 42 Quality Report, 2012

CS2300CP-CZZ Failure
CS2300CP-CZZ: AUX-OUT is not responding to changes in commands and remained tied CLK_IN.

 

Substandard Part Listing 

 

Maxim  DS17287-5+ (Date Code 1106) - 5.57% failure - Program & verify error.

 

Texas Instrument  BQ4017MC-70 (Date Code 1122) - 65% failure - Program & verify error.

 

Cirrus Logic, Inc. CS2300CP-CZZ (Date Codes 0841, 1027, and 1123)- 88.24% failure - Failed with both CLK_OUT and AUX_OUT pins noisy during start-up.

 

Altera Corporation EP2S90F1020I4N (Date Codes 0917 & 0913) - 34.94% failure - Can not load the program via JTAG and AS Mode.

 

Xilinx Corporation XC4VLX40-10FFG1148I (Date Code 1121) - 6.54% failure - Program error that the VCCINT,VCCIO shorted to GND.

 

Toshiba TMPN3150B1AF (Date Code 0925) - 41.18% failure - Open and short pins and bad protective diodes.

Notes:

1. Statistics are calculated as a percentage of all lots dispositioned within the given time period.

2. "Accept" is defined as customer acceptance of report device condition.

3. "Pass" is defined as meeting electrical parameters defined by the agreed upon test plan.

 
We hope you find this report informative and usefull for your organization.

 

All the best,

Mark A. Rinehart
White Horse Laboratories