Try to Keep Your "COOL".
Serving the Construction Industry Since 1957
American Subcontractors Association
2013 Supplier of the Year
for
Orange County, Los Angeles, and the Inland Empire
|
|
Fort Irwin 32 Foot High Pump House Pour
with HUB Quick Form
supplied by HUB Construction Supplies and Equipment
Please click "HERE" to read the rest of the story |
Stay Healthy in the Heat
The body normally cools itself by sweating. During hot and humid weather, sweating isn't enough because humidity prevents evaporation that cools the body. Body temperature can rise to dangerous levels if multiple precautions are not taken, such as drinking water frequently and resting in the shade or air conditioning. Heat illnesses range from heat rash and heat cramps to heat exhaustion and heat stroke. Heat stroke requires immediate medical attention and can result in death.
To read the rest of the article, please click "HERE" 10 Hot-Weather Safety Tips for Construction Keeping a crew safe on a jobsite presents unique challenges when the mercury creeps above 90 degrees.
Please click "HERE" to see the 10 Safety Tips |
Levi's Stadium Eligible for LEED Gold
NRG Energy Inc. , the Santa Clara Stadium Authority and the San Francisco 49ers recently celebrated the completion of theNRG Solar Terrace as well as the photovoltaic solar systems for the three NRG Energy Bridges atLevi's Stadium. This step makes it the first stadium in the US that is home to a professional football team with LEED certification standards incorporated into the original design and architecture.
Please click "HERE" to read the rest of the article
|
$6.5 billion mega-project across from 49ers stadium gets bigger, closer to reality
One of Silicon Valley's biggest ever development proposals -- a new metropolis that would shoot up across from the 49ers stadium -- is getting even bigger and now has a behemoth of a price tag to go with it.
The City Place Santa Clara project has grown from 5.2 million square feet when it was unveiled last year to about 8 million square feet, more than five times the size of Santana Row. And the privately-financed project will cost an estimated $6.5 billion -- roughly the cost of the new Bay Bridge eastern span -- up from $1.5 billion previously.
Please click "HERE" to read the rest of the article
|
LACMTA's board OKs Purple Line Extension construction contract
July 24, 2014, the Los Angeles County Metropolitan Transportation Authority's (LACMTA) board approved a $1.6 billion contract with the Skanska, Traylor and Shea joint venture to construct the 3.9-mile first phase of the Purple Line Extension subway.
Please click "HERE" to read the rest of the article. |
World of Concrete Announces 2015 Crews That Rock
Hanley Wood Exhibitions has announced the launch of the fourth annual World of Concrete (WOC) CREWS THAT ROCK competition. Sponsored by BASF, CREWS THAT ROCK honors concrete and masonry construction crews for their teamwork and contributions to the industry. Crews can submit their outstanding projects completed in 2014 to be entered to win CREWS THAT ROCK. The two winning crews will receive a trip to WOC 2015, prizes, and widespread industry recognition.
Please click "HERE" to read the rest of the article. |
AEM: Restore Section 179 Small Business Expensing
The Association of Equipment Manufacturers (AEM) has called on Congress to restore the small business expensing level, also known as Section 179 expensing, to its previous $500,000 level as well as make it permanent and indexed to inflation. Click "HERE" to read the rest of the story
|
|
California Remains Highest Ranking State for Equipment Theft
LoJack Corporation released new data originating from the company's annual Construction Equipment Theft and Recovery in the United States study. LoJack's annual study and accompanying infographic review theft trends specific to construction equipment and tools equipped with the LoJack Stolen Vehicle Recovery System. To read the rest of the article, please click "HERE" |
RFID Is the Cure for San Francisco
Construction Project
Accurately monitoring the curing of concrete can be critical on large construction projects. If a slab is not given sufficient time to cure, cracks can develop when the next slab is poured, which would ruin that section. Companies have typically used temperature loggers with wires from the device running into the concrete, since concrete gives off heat as it cures. But wired sensors can be too cumbersome for large projects, so in such scenarios, a concrete consultant often sets a conservative estimated curing timeline based on the material being used, as well as other conditions. This often means extra time is built into a project's timeline, in order to ensure that all concrete poured is fully cured before employees proceed to the next step.
Please click "HERE" to read the rest of the story |
Planned LAX terminal will provide more room
for wide-bodied jets
The modernization of Los Angeles International Airport continued Monday with the approval of a new $900-million terminal that will add gates for wide-bodied aircraft and help eliminate a major inconvenience for travelers.
Airport commissioners unanimously approved construction of the northern half of a midfield concourse west of the Tom Bradley International Terminal, which is undergoing its own expansion and renovation.
Please click "HERE" to read the rest of the story |
Here's a puzzle that has confounded even the brightest among us.
You are on a Horse, galloping at a constant speed.
On your right side is a sharp drop off.
And on your left side is an Elephant traveling at the same speed as you.
Directly in front of you is a galloping Kangaroo and your horse is unable to overtake it.
Behind you is a Lion running at the same speed as you and the Kangaroo.
What must you do to safely get out of this highly dangerous situation?
Click "HERE" to see the solution
|
Product of the Month
Special Sale on LL500 Laser
Please click "HERE" to view the flyer
Please call your local HUB Location for more information.
Please click "HERE" to view the HUB Locations
|
|
|
|
"PUT A HUB STORE
IN YOUR POCKET!"
Check Out Our NEW
V.O.D. Mobile App
Whether we are open or closed, you can always use the
"Virtual Order Desk"
to get a quote or to place an order on our website.
24 hours per day,
7 days per week,
365 days per year.
Please click "HERE" to sign up.
|
QUOTE OF THE MONTH
"Failure is simply the opportunity to begin again, this time more intelligently."
-- Henry Ford
_______________
|
Click Here To

or log on to
|
Nonresidential Construction Starts Surge 34% in June
According to Reed Construction Data, the dollar value of construction starts in June, excluding residential activity, surged 34 percent versus May. The figures are in "current" dollars, meaning they are not adjusted for inflation.
Please click "HERE" to read the rest of the story.
|
White House endorses Republican highway bill
The White House on Monday backed a $10 billion bill in the House that would extend federal transportation funding through next spring.
The surprise endorsement of the bill, which is scheduled to come up for a vote in the House on Tuesday, clears the way for a deal with Democrats in the Senate.
Please click "HERE" to read the rest of the article
____________
|
Permeable Concrete.
What Makes It Green?
Permeable concrete (also called porous concrete, pervious concrete, no fines concrete and porous pavement) is a special type of concrete with a high porosity that allows water from precipitation and other sources to pass directly through, thereby reducing the runoff from a site and allowing groundwater recharge
For the rest of the story, please click "HERE"
|
Old Fresno bar is first building demolished to make way for high-speed rail
Demolition crews made short work of the old Annie's Hollywood Inn bar on Fresno's Golden State Boulevard on Monday, marking the first demolition statewide to make way for California's proposed high-speed rail project. Please click "HERE" to read the rest of the story.
|
Scan Here to Enter the
Hub Web Site
See Our NEW Mobile App
Available NOW!
_______________
|
TAKE A LOOK
AT OUR FLYERS !!
click on the link below to view the current sales promotions.
|
Please call the nearest HUB location if you have any questions or you require product information.
Please click "HERE" to view the
HUB Store Phone Numbers and Maps of each Location.
or simply call
888-482-4274
|
Check Out HUB T.V.
NEW VIDEOS ADDED DAILY
For Product Information and Instructional Videos,
Please click "HERE"
|
|
Please Visit our
"New & Improved" Website
to view Products, On-line Catalogs, Sales Flyers, and
News Items,
please click on the link below.
|
If you have any suggestions or comments, please e-mail the information to:
|
Thank you, we appreciate your interest in our Newsletter.
from the Marketing Department
Hub Construction Specialties, Inc.
randys@hubhasit.com
|
|
|
|
|