|
|
 |
 |
January 27, 2015
Quick Links:
|
|
 |
|
 |
FROM THE FUNDRAISING FRONT
The 2015-2016 campaign, GIVING OUR STUDENTS A STRONG FOUNDATION officially kicks off tomorrow evening at the Walton High School Open House.
January 28, 2015
3:45 pm and 6:30 pm
Please JOIN US:
Stop by one of our WHSF tables for coffee at
Open House
· Visit our website to see who has already contributed to the 2015-2016 campaign.
You can contribute to the campaign here:
GIVE OUR STUDENTS A STRONG FOUNDATION
Keep an eye out for the WHSF campaign letter in your mailbox this week!
|
Construction Update:
Progress continues on plans for the Walton Re-Build. Work in the field is still scheduled to begin this semester. The schematic documents, as reviewed by Principal McNeill, include the following high points:
- No reduction in overall parking spaces during construction;
- An acoustically engineered theater to seat an audience of 750;
- Seating for 3,000 in the Main Gym, which also includes an indoor running track on the balcony level;
- Two-story media center, which includes a 100 seat theater style classroom for collaborative class teaching;
- Campus wide WiFi access for all with ample charging stations throughout the buildings; and,
- Substantial increase in natural lighting, with the majority of classrooms having exterior windows.
We will continue to provide updates on design and construction as soon as the information becomes available.
|
|
|
 |
Walton High School Foundation
1590 Bill Murdock Road
Marietta, Georgia 30062
|
|