The steel culvert just north of Loveland at mile marker 41.5 has been replaced. This required cutting the Trail, removing the old steel culvert, inserting the new plastic culvert, and backfilling with gravel. We're going to let the gravel settle a bit before laying asphalt sometime after July 1.
 
The infrared remediation of the 30 patches just south of Morrow at mile marker 28.5 were completed last Wednesday May 19. For a look at what this infrared process is all about, click here.
 
At our Annual Meeting on Sunday, the following Board members and officers were elected:
 
Steve Murphy, President
Simeon Copple, Vice President
Robert Brooks, Treasurer
Jessica Evans, Secretary
Connie Crockett
Robert Hargis
Eric Partee
  
Connie Crockett and Tony Blizniak are currently looking at our options for Trail signage. We're looking at both the "Information Kiosk"
Information Kiosk
Information Kiosk
 
and the standard Ohio to Erie trail signage.
Ohio to Erie Sign
Ohio to Erie Sign
 
Robert Brooks is currently leading the effort to get our pipe safes installed in high traffic areas, e.g. Terrace Park/Milford, Loveland, Morrow, Corwin, etc.
Pipe Safe
Pipe Safe
 
 
Remember, this Saturday May 29 the Friends of the Little Miami State Park are hosting their One Way Bike Tours. There are 4 separate bike tours of differing lengths, each led by a naturalist.
 
 
 