Issue:04                                                                           June/2008
Greetings!
 
Featured this month is the home of John and Kathy Moreland. Their home is situated on a one acre lot in "The Reserve at Benson Creek", a new subdivision in Frankfort off US 127S out Green Wilson Road. Read on to see how they made their dream a reality with UBuildIt!
 
 
 
Build Cost: $295,343
 
Finished Sq Ft: 2,458/$120 ft
 
Total Sq Ft:  4,067/$73 ft
 
Land Cost: $57,900
 
Appraised Value: $384,000
 
INSTANT EQUITY: $30,757
"This was a very positive experience. Wayne was a pleasure to work with, was very patient and went well beyond the call of duty. UBuildIt makes the process very easy to understand and follow. I would recommend UBuildIt to using a GC anytime. Besides the cost savings, there is a sense of ownership that you just don"t get any the way."
 
--John and Kathy Moreland
Conversations with John and Kathy
 
                                                     
What upgrades did you add?
We upgraded our windows and added a circular concrete driveway in front of the house. We also added a more energy efficient HVAC system.
 
What was your reason for building?  We wanted a custom home - one with amenities that fit our lifestyle.
 
Why did you choose UBuildIt? 
We controlled the project - who would complete various portions of construction, what the cost would be, how we would assign cost (savings in some areas, upgrading in other areas), how long the construction would take, etc.
 
What was the hardest part about building? Starting. I was scared to death. But UBuildIt was there to back me up every step of the way. At some point I relaxed and began to enjoy the process. The last few weeks were a little harried as well, but again, UBuildIt, was there to help me get things finished up.
Basement Foundation
"Kathy and Mike (with UBC Materials) Chatting!"
We recommend poured concrete, ICF or Superior Walls for our clients full basements. There are advantages and disadvantages to each method, and part of our process is to clearly delinate these.  
Framing-Prefabricated Panels
"The Framing Is A Panelized System!"
All the framing on this house was built in the factory and brought on to the jobsite by tractor trailer truck in prefabricated wall panels. The engineering of the house is also done by the panel manufacturer which is United Building Supply (now ProBuild) out of Lexington, KY.
 
Framing-Stick Built Roof 
"The Ridge Boards Go Up!"
We decided to go with a stick built roof on this house in order to have the additional attic space available for storage. With a truss roof system they typically go up quite fast but you end up losing alot of good storage space due to the additional supports in the truss design. 
News Flash From UBuildIt.com !!!!!
   
We thought you might be interested in reading one of the latest articles on our website. Each week we add new and informative articles on a variety of topics and post them at www.UBuildit.com.  
 
The Builder in You section provides Home Building and Remodeling information and advice for those who want to build or remodel their own fully custom home. You'll find helpful DIY tips and a source for building your own home. 
 
This week's feature article is:
  

        "What Are The 4 Basic Elements of Green Building?"

 
 
Click this link below to view the article. 
 
 

 
http://ubuildit.com/blog/category/green-building/
Mechanical Installation
"Kathy is Smiling and The Subs are Happy-Can't Get Any Better
Kathy was a very organized and efficient project manager of her dream home.  She has a financial background and it really showed in how she managed the money and all the details of her UBuildIt project.
Masonry Exterior/Garage in Basement
"Cost Saving Ideas Always Brought Forward"
When we were in the initial design phase of the project the garage was on the first floor. We did our initial project estimate and the Morelands felt they needed to cut about 30K off their dream home bottom line. Moving the garage into the basement reduced the amount of house under roof and brought the home in budget. "Balancing wants and needs" with the budget is the  name of the game. This change was not what they initially wanted... but the 30K in savings changed their minds!
 
More Conversations With John and Kathy
 
What was the best part of building?   There is a great deal of pride in your accomplishment. I look at our home now and think "I did this myself." I know how every part of my home is built - the materials used, how things were installed.
 
How much time did you spend on the project?   I usually spend an hour or so in the mornings setting up the processes. I would go to the site at lunch on hte average of 2-3 times a week, to take care of issues and to make sure things were progressing. I spend a couple of hours at the site in the evening reviewing the days work and cleaning up.
 
Any other comments?  I would do this again and I would'nt use anyone other than UBuildIt. They are amazing!  Kathy Moreland
Want Some Free Help With Your Project?
 http://www.buildwithequity.com/appointment_set
Greatroom Fireplace
"That Flatscreen HDTV Sure Fits Well Over the Fireplace!"
It kind of makes you want to sit in this cozy greatroom with a fire in the fireplace, a warm beverage and a Kentucky Wildcats game on the TV. The Moreland home is very comfortable and liveable.
Rear Exterior of Home
"The Puppy Has His Own Porch!"
Kathy and Johns home opens out to a large backyard with lots of space to enjoy living. John told me that the deer and other assorted wildlife come to visit him quite often!
 
"The Moreland Dream Home is Complete!"
 