The Gabriel
Team Has
Been Solving
Concrete
Problems
Since 1964
Below Are
a Few of the
Many Concrete
Applications
Guided by Our
Technical Team |
Gabriel Will Guide You at Restoring the Gloss to Your Seamless, Painted, or Epoxy Floors.
You Will Be Amazed at the Results. |
Gabriel Will Guide Your Every Step...
1. Cleaning
2. Conditioning
3. Priming
4. Painting
5. Upkeep | |
|
Volume 100 - Issue 6
Much Has Been Written About Concrete Failure...
When All is Said & Done,
It's About Adding the
Least Amount of Water
& Not Over-Mixing
Have you ever had to deal with bad concrete - cracking, surface erosion to the point of where stones appear and come loose, severe dusting, loosening floor tiles, etc.? Were you ever told that failure was due to the sun, weather, water table, placed on too hot or cold of a day, etc.? Did the concrete installer ever admit to using an inferior batch of concrete and/or over-working the placed material?
Concrete was invented by the Romans in the second century B.C., and, for all intent, it's still made the same way today by mixing cement powder, sand, stone, and water - and mixed for a short period of time. If the art of making concrete is virtually the same as in Roman times, why are there Roman concrete structures still standing after more than 2,000 years and many of today's concrete jobs fail soon after installation?
The process of concrete setting and hardening is called curing which is similar to a cake baking in an oven. The difference being that an oven is fueled by gas or electricity and concrete curing gets its heat from the chemical reaction between the cement powder and water.
Both, the cake and concrete mix, get transformed from a slush-mix to a firm state by the addition of heat for a length of time. The curing/baking time is set by nature which provides the guide for the baker or the concrete mason to follow. Severe failure can also be caused by too little heat (winter cold) or too much heat (direct hot sun).
The Romans would mix their concrete by hand, within a few foot steps from the placement site to ensure sufficient handling time (placement, leveling, troweling, etc.) without having to add more water. Once placed, the concrete was covered and left for weeks to cure to maximum strength.
After over 45 years of working with concrete, I feel that my take on the matter has merit.
Perils of adding too much water: From the moment water is introduced to the dry mix, the wet cement powder generates heat. The Romans would add just enough water to ensure getting the maximum amount of heat from the cement powder. Because the Romans would place the concrete mix in a minimal amount of time, virtually all of the heat went to curing (baking) the concrete to its maximum strength. Today, as more water is added to prevent mix hardening, the heat gets diverted to warming the excessive amount of cold water - heat travels from hot to cold. Because the amount of fuel (cement powder) is not increased, less heat is left to cure the concrete. i.e. An under-baked cake or cookie.
Size of concrete voids: If the concrete mix contains a maximum amount of dry material and a minimal amount of water, the space water filled when the mix was wet becomes a void when the concrete cures. The result: Less water begets smaller voids and stronger concrete. More water begets larger voids and less actual concrete. More water sets concrete up for curing deficiencies and failure risks.
Bottom line: The concrete professionals need to stop beating-around-the-bush as to why much of today's concrete fails to perform as well as the Romans' product. The adage, "When you point one finger at someone or something, you are pointing three fingers at yourself", fits this problem well. Today's concrete failure problems begin with mixing improprieties linked to the quest of getting a job done quicker, cheaper, and nothing beyond legal requirements. The quality of professional pride and accountability has mutated to verbal grandstanding deflecting the proverbial buck (pointing the finger) into the black hole of greed and irresponsibility.
To help prevent common concrete failures: 1. Don't start adding water to the dry mix until about 10 minutes before the mix is to be placed. And, add only a minimal amount of water. 2. Employ testing practices that are pragmatic and not just a tool for diverting the real blame. 3. Mix, place, and cure concrete with Roman precision.
Accountability fosters pride, craftsmanship, and triumph over unnecessary failure. Demand concrete excellence and you will always fare better.
If you wish to discuss a concrete problem, please feel free to contact me or a Gabriel Concrete Advisor.
Thank you for allowing me into your day.
p.s. Our Custodian Dispatch e-mails focus on improving staff performance, morale, job pride, and facility health and safety. My goal is to help readers make great things happen and still slash labor and material costs.
If you wish to no longer receive our Custodian Dispatch e-mails, please click here or below.
Again, thank you for the courtesy of allowing me this visit.
|
|
Best Concrete Patch...
Guaranteed Results
Con-Patch virtually welds the broken pieces of concrete together.
Call us to disucss your situation.
|
Distance Learning for Custodians
Knowledge unlocks a product's potential.
Our Instructors do not pitch Gabriel products...
They Teach what custodians need to know.
Our Instructors are field-experienced professionals who teach custodial staff personnel the chemistry, physics, and biology of cleaning in a logical way. Attendees refer to the class as a great "eye opener".
| |
Gabriel First Corp.
233 West Commercial Street
East Rochester, NY 14445-0191
585-381-7000 - 800-873-2000 - FAX: 585-248-3939
TQH, Total Quality Housekeeping, and Gabriel Housekeeping
Institute are Registered Trademarks ® of the Gabriel First Corp.
© 2009 Gabriel First Corp. | |
|