Dear Residents,

 

Sidewalks in need of repair have been identified in the following Southchase subdivisions (maps attached) through citizen inquiries and further evaluation by Orange County staff.

 

Southchase PH 1B Village 5

Southchase PH 1B Village 6

Southchase PH 1B Village 13 PH 1

Southchase PH 1B Village 13 PH 2

 

The sidewalk repair assessment is ongoing throughout unincorporated Orange County, and the work is prioritized in order to address safety hazards to pedestrians and to mitigate liability to the County. Sidewalk panels that are severely deteriorated or broken are replaced. In cases where tree roots raise the sidewalk panels, a few additional sections may need to be replaced in order to create a smooth transition.

 

Tree roots are often removed in order to construct the new sidewalk sections to the proper grade and thickness. This removal should not affect the stability of the trees since the main roots of the tree are not disturbed.

 

Please note that while the repair work is scheduled, asphalt patches may be put in place to temporarily address any tripping hazards while the sidewalk repair work is assigned to a contractor. The repair work should commence within the next couple of weeks to allow time for the utility coordination and notification to the residents and businesses via door hangers. These door hanger notifications will provide more specific information on the timeframe for the repairs.

 

Southchase PH1B Village 5 & 6

Southchase PH 1B Village 13

 

 If you have any questions please call (407) 836-8039. 

 

Regards,

Jennifer Thompson

Orange County Commissioner, District 4

201 S. Rosalind Avenue

Orlando, FL 32801

407-836-7350

www.jenniferthompson.net 

Like us on Facebook Follow us on Twitter