GrafTech International





The HotPressed™ Refractory Difference
The Proven Choice
May 2008
 

Quick Links  

Join our list  
Join our mailing list!

Dear Valued Customer:

2008 has "just begun" and our HotPressed™ brick plant is already sold out until the middle of 2009! The rest of the capacity is filling up fast. For those readers that have postponed their lining decision, please reconsider; we would like to service you the way you have come to expect, with competitive delivery times and unsurpassed product performance. Contact us to order and schedule delivery; the sooner the better!

Need a fast price indication for a blast furnace hearth lining?
 
Use the GrafTech™ Hearth Calculator service, soon to be introduced on our website!
Image of hearth calculator

GrafTech is pleased to introduce the Hearth Calculator to our customers. When planning a reline or new furnace project, the Hearth Calculator will help you to start estimating your investment costs.

Speeding up the planning process and potentially reducing project cost, this web-based tool, soon available on www.graftech.com, allows the project engineer, the furnace operator or the lining purchaser to enter the actual data for the blast furnace hearth in question (dimensions, number of tapholes, etc). This results in an instant budgetary cost calculation for the GrafTech™ lining!

In addition, the Hearth Calculator user can easily conclude how changing different parameters might impact the indicated cost.

But, as we all know, there is more to the cost than the initial price paid; for insight into the long term value of your lining investment, please consult our Hearth Investment Financial Model featured on our website at www.graftech.com .


BHP Billiton's TEMCO plant converts to the HotPressed™ Refractory System
 

Quoting Mr. Greg Hannan, General Manager, TEMCO:

"TEMCO will fully convert the 4 manganese furnaces to the HotPressed™ Refractory System technology. Our motivation has been to extend the reline life from a historical 10 year to 15+ years. We aim to achieve lower overall cost of operation with improved lining safety. The combination of quality materials, a design specific to the TEMCO operations and adopting a rigorous lining management philosophy, should ensure a successful result"

This 4-furnace FeMn & SiMn facility is located near Bell Bay, in Tasmania.

From our first meetings, which occurred in the late 90's, it became clear that TEMCO was continuously looking for ways to boost productivity and reduce costs in order to remain competitive in the international ferroalloy market.

The HotPressed™ Refractory System, with its simple and sound functional concept, was soon perceived as an important asset to achieve TEMCO's goals.

TEMCO replaced the old insulated lining system of Furnace 1 with a complete GrafTech™ lining in June, 2001. This 36 MVA unit has been running continuously since then at high productivity, either on FeMn or SiMn, with no refractory maintenance at all. In addition, all temperature readings show a stable trend, which confirms the expectation of a long and trouble-free campaign.

The superior performance of Furnace 1, and the overwhelming success of the HotPressed™ Refractory System at many ferroalloy furnaces in other parts of the world, paved the way to convert the other furnaces at TEMCO.

The next furnace to be relined was Furnace 3 (pictured below), a 54MVA unit. This GrafTech™ lining was installed in June, 2007.

As Mr. Hannan says, "TEMCO has now decided to convert the remaining two furnaces to the GrafTech HotPressed™ Refractory System. The purchase orders for Furnace 2 (33 MVA) and Furnace 5 (51 MVA) have been placed and the delivery is scheduled for 2008".


Shaoguan #8-The 50th GrafTech Hearth Wall Order In China!
 
Henry Yu shaking hands

Photo is showing Mr. Xie Minjiang, CISDI procurement manager and the turnkey contractor for the furnace and Mr. Henry Yu, GrafTech discussing Shaoguan details.

In January, GrafTech signed the order for its 50th hearth wall order in China; Shaoguan #8. .

  • Blow-in date: December 2008
  • Hearth diameter: 1264cm
  • Inner volume: 3200m³
  • Design Production: 2,35 tm³/(day)
  • Tapholes: 4

And as we speak, Chinese hearth wall orders #51-56 were awarded to GrafTech! One of these is the hearth wall for Shougang Jingtang #2, a new 15.5m / I.V. 5.000 cu m furnace. Now that's BIG! After having worked the last 25 years in the demanding Chinese market, Graftech has built an outstanding reputation offering excellent performance and unsurpassed value-in-use. The plant is located in the town of Maba in northern China, famous for being the original place of Zen Buddhism about 1300 years ago.


HotPressed™ Bricks-The Movie
 
HotPressed Bricks

This 1 minute film will show you an abbreviated story on how the NMA™ and NMD™ HotPressed™ bricks are made. This unique process in our Lawrenceburg, Tennessee plant is in motion 24 hours per day, 7 days per week. The result are carbon and semigraphite HotPressed™ bricks. These have proven to offer our customers exceptionally long, safe and trouble free campaigns. Enjoy the mini-movie at the link below: HotPressed™ Brick-The Movie


SmartRepair-an emergency repair offer from GrafTech and Pirson
 
Corus Scunthorpe

In the last 2 years alone, at least 4 break-outs per year through "micropore" carbon "big block" hearth walls were recorded around the world. Break-outs through HotPressed™ brick linings? Zero-contact us for further details. These emergencies need fast and highly qualified repair services! Needless to say, in today's marketplace, lost production will have a major impact on the bottom line for any iron and steel producer!

Pirson Refractories, the European installation experts, and Graftech can provide all furnace operators a unique offer in case of lining disasters:

  • 1st assessment within 24 hours after being contacted.
  • Engineering starting within 24 hours.
  • Repair scenario utilizing GrafTech carbon and graphite material fully available within 48 hours!

For further information and details about these services, call or email Pirson 24 hours a day, 365 days a year:

Phone: +31 (0) 251 27 24 12 Email: smartrepair@pirsonholland.nl



GrafTech has been the world leader in the production of carbon and graphite products for more than 120 years. Since developing the freeze lining technology based on its unique HotPressed™ Brick process, GrafTech has the only hearth lining system that supports higher productivity and lower operating cost!

GrafTech, HotPressed, NMA and NMD are trademarks of GrafTech International Holdings Inc. This information contained in or referred to in this newsletter is based on data believed to be reliable but GrafTech makes no warranties, express or implied, as to its accuracy and assumes no liability arising out of its use. GrafTech's liability to purchasers is expressly limited to the terms and conditions of sale.

Sincerely,


Your HotPressed™ Refractory System's Team
GrafTech International

Phone: 931-380-4348
Fax: 931-380-4308
Email Marketing by