The HotPressed™ Refractory Difference
The Proven Choice
|
|
May 2008
|
|
Dear Valued Customer:
2008 has "just begun" and our HotPressed™
brick plant is already sold out until the middle of 2009!
The rest of the capacity is filling up fast. For those
readers that have postponed their lining decision,
please reconsider; we would like to service you
the way you have come to expect, with competitive
delivery times and unsurpassed product performance.
Contact us to order and schedule delivery; the sooner
the better!
Need a fast price indication for a blast furnace hearth lining?
|
|
Use the GrafTech™ Hearth Calculator service, soon to be introduced on our website!
GrafTech is pleased to introduce the Hearth
Calculator to our customers. When planning a reline
or new
furnace project, the Hearth Calculator will help you to
start estimating your investment costs.
Speeding up the planning process and potentially
reducing project cost, this web-based tool, soon
available on www.graftech.com,
allows the project engineer, the furnace operator or
the lining purchaser to enter the actual data for the
blast furnace hearth in question (dimensions,
number of tapholes, etc). This results in an instant
budgetary cost calculation for the GrafTech™
lining!
In addition, the Hearth Calculator user can easily
conclude how changing different parameters might
impact the indicated cost.
But, as we all know, there is more to the cost than the
initial price paid; for insight into the long term value of
your lining investment, please consult our Hearth
Investment Financial Model featured on our website at
www.graftech.com .
|
BHP Billiton's TEMCO plant converts to the HotPressed™ Refractory System
|
|
Quoting Mr. Greg Hannan, General Manager, TEMCO:
"TEMCO will fully convert the 4 manganese furnaces
to the HotPressed™
Refractory System technology.
Our motivation has been to extend the reline life from
a historical 10 year to 15+ years. We aim to achieve
lower overall cost of operation with improved lining
safety. The combination of quality materials, a design
specific to the TEMCO operations and adopting a
rigorous
lining management philosophy, should ensure a
successful result"
This 4-furnace FeMn & SiMn facility is located near
Bell Bay, in Tasmania.
From our first meetings, which occurred in the late
90's, it became clear that TEMCO was continuously
looking for ways to boost productivity and reduce
costs in order to remain competitive in the
international ferroalloy market.
The HotPressed™ Refractory System, with its
simple and sound functional concept, was soon
perceived as an important asset to achieve TEMCO's
goals.
TEMCO replaced the old insulated lining system of
Furnace 1 with a complete GrafTech™ lining in
June, 2001. This 36 MVA unit has been
running continuously
since then at high productivity, either on FeMn or SiMn,
with no refractory maintenance at all. In addition, all
temperature readings show a stable trend,
which confirms the expectation of a long and
trouble-free campaign.
The superior performance of Furnace 1, and the
overwhelming success of the HotPressed™
Refractory System at many ferroalloy furnaces in other
parts of the world, paved the way to convert the other
furnaces at TEMCO.
The next furnace to be relined was Furnace 3
(pictured below), a 54MVA unit. This GrafTech™
lining was installed in June, 2007.
As Mr. Hannan says, "TEMCO has now decided to
convert the remaining two furnaces to the GrafTech
HotPressed™ Refractory System. The purchase
orders for Furnace 2 (33 MVA) and Furnace 5 (51 MVA)
have been placed and the delivery is scheduled for
2008".
|
Shaoguan #8-The 50th GrafTech Hearth Wall Order In China!
|
|
Photo is showing Mr. Xie Minjiang, CISDI
procurement manager and the turnkey contractor for
the furnace and Mr. Henry Yu, GrafTech discussing
Shaoguan details.
In January, GrafTech signed the order for its 50th
hearth wall order in China; Shaoguan #8.
.
- Blow-in date: December 2008
- Hearth diameter: 1264cm
- Inner volume: 3200m³
- Design Production: 2,35 tm³/(day)
- Tapholes: 4
And as we speak, Chinese hearth wall orders #51-56
were awarded to GrafTech! One of these is the hearth
wall for Shougang Jingtang #2, a new 15.5m / I.V.
5.000 cu m furnace. Now that's BIG! After having
worked
the last 25 years in the demanding Chinese market,
Graftech has built an outstanding reputation offering
excellent performance and unsurpassed
value-in-use. The plant is located in the town of
Maba in northern China, famous for being the original
place of Zen Buddhism about 1300 years ago.
|
HotPressed™ Bricks-The Movie
|
|
This 1 minute film will show you an abbreviated story
on how the NMA™ and NMD™
HotPressed™ bricks
are made. This unique process in our Lawrenceburg,
Tennessee plant is in motion 24 hours per day, 7
days per week. The result are carbon and
semigraphite HotPressed™ bricks. These have
proven to offer our customers exceptionally long, safe
and trouble free campaigns. Enjoy the mini-movie at
the link below: HotPressed™ Brick-The
Movie
|
SmartRepair-an emergency repair offer from GrafTech and Pirson
|
|
In the last 2 years alone, at least 4 break-outs per year
through "micropore" carbon "big block" hearth walls
were recorded around the world. Break-outs through
HotPressed™ brick linings? Zero-contact
us for further details. These emergencies need
fast and
highly
qualified repair services! Needless to say, in today's
marketplace, lost production will have a major impact
on the bottom line for any iron and steel producer!
Pirson Refractories, the European installation experts,
and Graftech can provide all furnace operators a
unique offer in case of lining disasters:
- 1st assessment within 24 hours after being
contacted.
- Engineering starting within 24 hours.
- Repair scenario utilizing GrafTech carbon and
graphite material fully available within 48 hours!
For further information and details about these
services, call or email Pirson 24 hours a day, 365
days a year:
Phone: +31 (0) 251 27 24 12
Email: smartrepair@pirsonholland.nl
|
|
|
GrafTech has been the world leader in the production
of
carbon and graphite products for more than 120
years. Since developing the freeze lining technology
based on its unique HotPressed™
Brick
process, GrafTech has the only hearth lining system
that supports higher productivity and lower operating
cost!
GrafTech, HotPressed, NMA and NMD are trademarks
of
GrafTech International Holdings Inc. This information
contained in or referred to in this newsletter is based
on data believed to be reliable but GrafTech makes no
warranties, express or implied, as to its accuracy and
assumes no liability arising out of its use. GrafTech's
liability to purchasers is expressly limited to the terms
and conditions of sale.
Sincerely,
Your HotPressed™ Refractory System's Team
GrafTech International
Phone:
931-380-4348
Fax:
931-380-4308
|
|
|