Delivering Technology with Knowledge and Experience to Maximize our Customer's People, Operations and Profitability.

Gas Equipment Co.
e-Newsletter
GEC Color
Sharing News & Specials with our customersMARCH - 2011

 

GEC e-Newsletter Archive Homepage

For copies of our previous issues click Archives.

Click Here for Archives
Dear Valued Customer:
Gas Equipment Company is pleased to provide the e-Newsletter as a service to share useful & valuable information about the products & services we offer.  You will find sections on technical topics, new product announcements, "Did You Know" regulatory compliance requirements, "Virtual Warehouse" online ordering tips, along with an occasional "What's Wrong with this Picture?" section.  We hope you enjoy the Gas Equipment Company e-Newsletter and choose to continue receiving it.

"Did You Know?"

NFPA 58 Rules on Cathodic Protection 

Corrosion Protection System requirements for UG tanks

 UG Tank

The 2011 edition of NFPA 58 includes several changes for the installation of cathodic protection devices, which now must be installed, tested and monitored on all new underground propane-storage containers. These new rules are found in section 6.6.6.1(A)-(O).


One aspect of the new rules require a corrosion protection system shall be installed on new installations of underground steel containers, unless technical justification is provided to the authority having jurisdiction.  The corrosion protection system shall include the following: 1) a container coating complying with 5.2.1.11, 2) a cathodic protection system that consists of a sacrificial anode(s) or impressed current anode, and 3) a means to test the performance of the cathodic protection system.


Another aspect of the new rules is the cathodic protection system shall be monitored by testing and the results documented.


The sacrificial anodes shall be tested upon installation; for continued verification of the effectiveness of the system, 12-18 months after the initial test, and follow-up testing shall be performed at intervals not to exceed 36 months.


The Propane Education & Research Council has developed a training program that includes a handbook and a DVD. The video shows how to guard against corrosion of underground propane tanks and black iron or steel piping.

Electrodes

CLICK HERE for the Underground Tank Testing Flyer 

 

GEC offers marketers a number of optional testing kits and replacement maintenance products for use in the installation, testing, and maintenance of underground tank installations.

 

GEC also offers FREE training on how to measure tank-to-soil cathodic protection potentials on propane tanks.  Contact your sales representative or branch for more information on cathodic protection products, test kits, and training.

 

For more information on GEC Training programs click the link in the right hand margin with the Training Program listing. 

 "TECH Topic"

COPPER SULFATE CRYSTALS & ELECTRODES

Copper Sulfate Crystals

 

Note: Under average conditions, an electrode should be emptied and cleaned out every two or three months. However, if the electrode is allowed to remain in prolonged contact with low resistivity soil or water, more frequent rejuvenation may be desirable.  For consistent results, manufacturers recommend using the highest purity CuSo4 Crystal's possible.

 

Precautions:

 

STORAGE: CuSo4 will deteriorate over time. Electrodes, which are purchased in bulk and stored for later use, should always be checked before placing into service. Copper rods can become tarnished or pitted by deteriorating CuSo4 and the CuSo4 will become unusable. The copper in this condition will become contaminated, which will cause inaccurate readings. CuSo4 should have a rich, deep blue color. If the crystals appear to have become whitened or have the appearance of being dehydrated, discard in a safe manner and replace with fresh. Do not store the electrodes in a damp atmosphere. Some types of fungus or mold can contaminate the ceramic plug assemblies. Always rotate your stock using the "FIFO" (First In, First Out) method.

 

Common Source of Error: The voltmeter used in conjunction with reference electrodes should be of sufficiently high impedance (10 megohms or greater) so that contact resistance, which can occur between electrode and soil, does not affect readings. When taking readings, the ceramic plug must come in contact with soil. Vegetation such as grass should be moved out of the way. Grass or other items will add resistance and result in inaccurate readings. Reference electrodes are designed to be durable, but over time, the ceramic plug assembly will become contaminated by foreign materials and become worn or cracked. At this point, the replacement of the ceramic plug assembly is highly recommended. If the CuSo4 mixture within the electrode becomes cloudy white, reverse osmosis has occurred and rejuvenation is recommended. Half Cell

 

 

GEC sells replacement CuSo4 copper sulfate crystals (PN 16906, .75 lbs) for half cells.  And, replacement electrode half cells (PN RE-5C). 

  MV Wrench

NEW PRODUCT: 

MV Wrench


· Eliminate excavation at customer site when repairing/replacing RegO Multivalve
· Use with standard 3/4" drive and extension
· Can be used with old style or new style RegO Ready-To-Go Presto-tap fitted Multivalves.
· Cast steel and heat treated for long service life.
· Designed by a Serviceman for Servicemen
MV Wrench Working

GEC is the exclusive distributor of the MV Wrench (PN MV Wrench)

GEC "Virtual Warehouse" Feature  

WHAT HAPPENS AFTER I PLACE MY ORDER


ORDER ACKNOWLEDGEMENT

 

When you place an online order it shows up in the home branch order queue, and you will immediately receive an email acknowledging we have received your order. Attached to the email will be a .pdf copy of the Bid confirming what you have ordered.

 

SHIPPING NOTICE


When our Customer Service Personnel process your order (bid), and the items are pulled, packed and shipped you will receive a second email "Shipping Notice" that will contain a direct link to the shipper and tracking information.

 

You can track the status of your order by clicking on the shipping link.

A .pdf copy of the invoice will also be attached to that email for your convenience.

                                 

GEC "Virtual Warehouse" TIP:


"My Account" gives you access to your account records with GEC for both your branch purchases and online purchases.  You can see all your account activity regardless if you called the branch and placed the order with a customer service representative or placed the order online.
 

Through Account Inquiry , you can see your current balance and any invoices outstanding. You will be able to see where payments were processed and applied.
 

Open Orders/Bids is anything that is pending - orders placed online or over the phone.  Maybe you called the branch and they sent you a quote on equipment. It can be found here.

 

Order History is under the My Account tab as well as Print Invoices.

 

"What's NOT Wrong" with this Picture? 
Emergency ShutOff

 

This is at a Dispenser location.
 

NFPA 58, Section 6.24.3.14 states an identified and accessible switch or circuit breaker shall be installed at a location not less than 20 ft or more than 100 ft from the dispensing  device(s) to shut off the  power in the event of a fire, accident, or other emergency. 


Section 6.24.3.15 states the markings for the switches or breakers shall be visible at the point of transfer.


Both requirements are in addition to the requirements of section 6.24.3.9, stating an identified and accessible remote emergency shutoff device for either the internal valve or the emergency shutoff valve required by section 6.24.3.8 (1) or (2) shall be installed not less than 3 ft or more than 100 ft from the liquid transfer point.

 

RegO Ready-To-Go Valves RegO Logo

 

 

What do you Call the ONE Valve that Saves YOU Time and Money PLUS reduces Emissions... REady ToGO

 

Ready to Go

PT7556 series                 PT9102 series                 PG8475 series     

RegO Products now offers three series of valves that feature these exclusive patented technologies... 

 

The Multibonnet allows for quick and easy replacement of the service valve stem packing without interruption of gas service or the added expense of evacuating the container. 

 

Test GaugeThe ready to use Presto-Tap fitting provides one of the most cost efficient and simplest methods of quickly and easily performing system pressure checks. You never need to "break" into the system and the patented Presto-Tap leak testing method will reduce fugitive emissions by up to 90%.

 

Each of these exclusive features will definitely "pay for themselves" in parts and labor savings with just one use - and they are only available from RegO. 

 

GEC sells both the RegO Ready-To-Go valves as well as Presto-Tap fittings, products and test gauges for high pressure tank pressure, first stage, and low pressure areas of propane gas distribution systems. 

 

Testing

CLICK HERE for RegO Ready-To-Go/Presto-Tap flyer with testing equipment for 3 sections of the distribution system; tank pressure/first stage/and last stage

NOTICE: from PRESTO-TAP

*** WATCH for Un-Listed "Knock-Offs"***  

 

PrestoTap

Knock-off refrigeration fitting            RV-L fittings                LDS2000/RV fittings                

 

Dear Valued Customer, it has come to the attention at Presto Tap that there are some "knock offs" or similar products being distributed and in some cases being referred to as the Presto Tap model RV-L regulator valve.


Currently Presto Tap is unsure of the components or origin of these knock off fittings and their compatibility to LP Gas. Some of these "knock offs" are designed to be soldered onto tubing in refrigeration systems as well as having 1/8" Male MNPT threads indicating they are designed for use with Freon instead of propane gas.


The official Presto Tap Model RV-L is packaged in plastic bags in quantities of 50 units with usage and installation instructions and bears the company logo along with the model number RV-L. Also the cap component is a brass hex cap containing a crushable copper seal. This product is designed to be installed at locations where pressure has been reduced from tank pressure.


The Patented and UL Listed Presto Tap Model LDS2000/RV is legal installed at any point in the LP Gas System including tank pressure.
 

Presto Tap is a registered trademark of Presto Tap LLC and should in no way be used in the description or marketing of  products other than genuine Presto Tap products.  If you have any questions please visit our web site at www.presto-tap.com.

 

GEC is a distributor of Presto-Tap fittings, test gauges, and products as well as the RegO Ready-To-Go Valves featuring Presto-Tap fittings.

 

Conversion of Cylinder Dispensers for Autogas Use
  
Do you have a traditional cylinder filling dispenser that won't produce enough differential pressure to fill an autogas (motor fuel) tank on a vehicle?  If you are unaware; new OEM and after-market vehicle conversions that are utilizing liquid injection, require pumps to overcome higher than normal differential pressures in the tanks.  Both Corken and Blackmer are manufacturing special high differential pressure (HDP) pumps specifically for the autogas and motor fuel refueling market.
    HDP Pumps
Click Here for Corken HDP Flyer             Click Here for Blackmer HDP flyer             
  
GEC offers HDP pumps for use in autogas dispensing applications.  For many of you, who already have made an investment in cylinder dispensing equipment, you can economically upgrade your cylinder dispensing station to HDP autogas dispensing by changing your traditional cylinder pump for a HDP pump product.  Additionally, GEC offers a pump/motor skid to be mounted between the dispenser and tank to mount the larger HDP pump if it will not fit inside the exisiting cylinder dispenser cabinet.GG RetrofitGG20

In addition to upgrading the pump and bypass valve for autogas applications GEC offers the GasGuard GG20 dispenser nozzle and a flush mount nozzle holster to attach to your existing cabinet for a dedicated autogas dispenser hose.  The holster and nozzle incorporates a means for locking the valve in the holster when unattended. 

Click Here to Sign Up for Our e-Newsletter!

Do you have associates who would like to sign up also? 

Forward this

email to them.

In This Issue
1) "Did You Know" NFPA 58 Rules Update
2) "TECH Topic" - CP Electrode Maintenance
3) NEW PRODUCT: MV Wrench
4) "Virtual Warehouse" Feature
5) "What's Wrong" with this Picture?
6) RegO Ready-To-Go Valves
7) NOTICE from Presto-Tap "Watch out for Knock-offs"
8) HDP Pumps in Dispensers
9) 2011 NPGA Intl Propane Expo WIN a FREE VIP Pass
10) Time is Running Out!
11) Centeron CELLULAR Tank Monitors
12) GEC Training Curricula
13) Employee Training Programs
Quick Links

Gas Equipment Co., Inc Website & link to "Virtual Warehouse" portal.

CLICK HERE
 to communicate with the e-Newsletter
or
 to REQUEST Additional information on featured products or articles.

GEC invites Customers to suggest topics for articles, technical discussions, and various product features for future issues.  Just click the "Click here" link above and submit your recommendations.

2011 NPGA International Propane EXPO Trade Show

 NPGA

 

Want to visit the 2011 NPGA International Propane Expo Trade Show in Atlanta?

 

As a valued and loyal customer you can register with GEC for a FREE chance to receive a one-day VIP Complimentary pass to visit the 2011 NPGA Propane Expo exhibit hall.

 

 
The FREE VIP Pass provides a single-day admission to the exhibit hall on either Sunday, April 17, 2011 or Monday, April 18, 2011. NPGA prohibits the VIP Pass from being combined for multiple days.

 


Registrations for the limited number of

1-day VIP pass will be accepted through Tuesday, March 15th.


Simply CLICK the link below and email us the following information for the drawing: (Please reference VIP PASS in the subject line)

 

1)   First Name:

2)   Last Name:

3)   Company:

4)   Title:

5)   City:

6)   State:

7)   Zip:

8)   Phone:

9)   Fax:

10) Email:

11) Select Attendance Day: Sunday-April 17th or Monday-April 18th

 

We will notify you if you have been selected within the next week. 

 

 Click Here to Register for VIP Passes

 

 

 

Time is Running Out!

T
ime is Running Out!
The Deadline is Near
 
WE HAVE INVENTORY!

Buy Now

Before Price Increases & Shortages

2011 Compliance Deadline for NFPA 58, LP-Gas Code is

July 1, 2011

 

- ONLY - 

3 Months Left!

Bulk Storage Upgrade


Centeron Cellular Tank Monitors

 

Purchase one Centeron Cellular monitor for a 3 month trial and Data fees are included at no charge. 

  

Return in good working condition at any time within the 3 month period and receive a full refund. 

Purchase an additional 10 monitors within 6 months of the original purchase date and receive another monitor free.
 

The 3 Month trial period begins when the monitor is set up and activated on the Centeron Data Center.


Offer is good for first time Centeron Cellular Propane Monitor customers only.

 

Promotion ends

 

March 24, 2011

 

-----------------------

 

The Centeron IS Cellular Propane Monitor is the first cellular propane monitor approved for use in flammable atmospheres.

 

 

 CellularMonitor

  

*  Class I, Division I, Group D certified for use in flammable atmospheres.

 

* Simplified installation-no phone landline access or power required.

  

*  Optional GPS pinpoints exact tank location for locating mobile and nonfixed assets.

 

*  Low & high level alarms

 

Fill detection, theft detection, flexible reporting schedule & end-of-month reporting features included.

 

*  Works with traditional call blocks. 

 

 

 

 

 

 

 

 

 

 

 

GEC Training Curricula Listing

 

Training List

CLICK FOR GEC TRAINING CURRICULA FLYER

Click for a PDF of GEC Training Curricula listing
 
Employee TRAINING Programs
 
 Have you hired new employees recently and need them to be trained on various products?

Our representatives can conduct FREE training classes at your location.  Click the link below to review a list of our current training curricula.
Or ask for specific product information training classes.

 

Training GEC
Click Here to view a list of our Training Curricula

Contact your sales representative or call one of our offices to request a representative to setup a FREE training session at your location for your employees.

 

Inet Specials

Save with Internet Specials

Visit www.gasequipment.com and shop online at the "GEC Virtual Warehouse" and take advantage of several Internet Specials. 

ALL YOU HAVE TO DO IS REGISTER FOR A WEB ORDER ENTRY (WOE) ACCOUNT WITH GEC*.  You'll be issued a confidential user I.D. and password that will allow you to order on your schedule, not someone else's.

Click "Register for Online Ordering" to get started.

 

*All registrants must have a current account with GEC in good standing before the WOE account can be activated.

 

For a copy of the GEC Solutions introducing our CLICK, SEARCH, BUY, MANAGE edition of our Virtual Warehouse email your request to

e-newsletter@gasequipment.com

Online Specials are changed regularly, check back periodically for new offerings!

For Specific Product or Service Questions please contact one of our Customer Service Warehouses below.

Atlanta GA

(800) 241-4155

Dallas TX

(800) 821-1829

Fayetteville NC

(800) 447-1625

Houston TX

(800) 334-7816

Indianapolis IN

(800) 241-1971

Kansas City MO

(800) 821-5062

Little Rock AR

(800) 643-8222

Orlando  FL

(800) 821-0631

Richmond VA

(800) 368-4013

St. Louis MO

(800) 423-4685

Contact Information

GEC e-Newsletter
e-newsletter@gasequipment.com

Click Here to Sign up for our e-Newsletter!

Do you have associates who would like to sign up also? 

Forward this email to them.

e-NewsClick Here for e-Newsletter Archives 

 

Do you recall reading an article in a previous email newsletter

but have since deleted it? 

Click the link above to access previously emailed

newsletters in our archive homepage.