Week 37 Report

 

Inspection:

54.6% Accept

 

Testing:

75% Pass

Week 37 chart                            
White Horse Laboratories' Quality Report
Week 37, 2012
 

Week 37 Summary 

  

Inspection results could not maintain a fifith consecutive week of improved yields as buyer acceptance dropped from Week 36's high of 92% back to a humbling 54.6% in Week 37.

 

Electrical testing yields, however, recovered to 75% in Week 37 after having tumbled to just over 64% in Week 36.

 

A broader range of devices were seen in Week 37, perhaps signaling a broader-base or required components rather than spot shortages on certain device categories. Device range was from passives through processors and DSP.

Week 37 Quality Report, 2012

MAX4435EUK-T Distorition input and output waves

 

Substandard Part Listing

 

Xilinx XC4VFX100-12FFG1152C (Date Code 1149) - 100% failure - Can not be programmed via JTAG, the VCCINT and VCCIO shorted to GND.

 

Xilinx  XC4010XL-2PQ100C (Date Code 0721) -97.97% failure - Can not load the bitstream via PROM and JTAG.

 

Maxim MAX4435EUK-T (Date code not marked or labeled)- 100% failureDistorted ouput.

 

Nichicon UHE1A102MPD6 (Date Code not marked or labeled) - 10% failure rate - Failed of high Capacitance.

 

Toshiba TD62074APG (Date code 1033) - 100% failure - the Heatsink/SUB pins 4 & 13 and 5 and 12 are not shorted together as specified.

 

Freescale Semiconductor MC912DG128ACPV-4K91D (Date Code 1123) - 5% failure - Program & verify error.

 

 

 

 

Notes:

1. Statistics are calculated as a percentage of all lots dispositioned within the given time period.

2. "Accept" is defined as customer acceptance of report device condition.

3. "Pass" is defined as meeting electrical parameters defined by the agreed upon test plan.

 
We hope you find this report informative and usefull for your organization.

 

All the best,

Mark A. Rinehart
White Horse Laboratories