|
|
|
Week 17 Results
Inspection:
70% Accept
Testing:
73% Pass |
|
|
|
| White Horse Laboratories' Quality Report | Work Week 17, 2011 |
|
|
Week 17 Analysis
Week 17 once again saw gains in both physical inspection and electrical testing results. Condition quality improved to 70% acceptance in Week 17 from 59% acceptance in Week 16 and functional performance leapt from 52% in Week 16 to 73% in Week 17. It is not overly surprising, then, that a higher percentage of acceptable product resulted in the highest volume week to-date, as measured by value.
While continuing to follow the supply chain effects of the now rebuilding process in Japan, that a significant volume of product from Japanese OCM are being sourced, the general quality level of these products has been quite good, with no rejected product in Week 17. Will continue to monitor and report on that as the impact of the natural disaster will likely have a significant impact on the industry throughout the course of 2011.
Mark A. Rinehart
Managing Director
White Horse Laboratories |
|
|
|
Week 17 Substandard Product Listing
| | Digital Device Test Program |
Infineon IPD79N06L3G (Date Code 1026) -
100% failure - low breakdown voltage, V(br)dss, high drain current, Idss, high gate threshold voltage, Vgs(th), and high on-state resistance, Rds(on).
Infineon SAB80C166M (Date Code 0426) - 5% failure - open pins, short pins, and bad protective diodes.
Xilinx XCF02SVOG20C (Date Codes 0719) - 5% failure - ID error, poor pin contacts, and damage pins.
Texas Instruments UC2842D8TR (Date Codes 0902 & 0923) - 82% failure - low reference voltage (measured 4V and spec is 4.95-5.05V).
Xilinx XC4010XL-2PQ100C (Date Code 0525) - 6% failure - program error.
National Semiconductor VP1210N2 (Date Codes 0029 & 0032) - 100% failure - low on-state drain current, Id(on), high on-stat drain-source resistance, Rds(on), and high source-drain voltage, Vsd. | |
|
|
Weekly Quality Report Archives Electronic Component Counterfeit Detection

Greetings!
Since 2009, White Horse has been publishing Weekly Quality Reports. These reports contain lists of part numbers with high electrical failure rates that should be considered high risk. Within these reports, you can also spot trends for overall product quality in the market, industry volume trends, and you can drill into the manufacturers and part numbers to identify highest risk component categories and OCMs.
We are now providing you with access to historical reports through the archives available on our website. Note we do not list individual companies. We consider all test and inspection reports to be confidential to the requestor and White Horse is not authorized to disclose and distribute that information. | |
|
The Buddha's Birthday
Hong Kong Bank Holiday, Tuesday, May 10
It would seem strange to go an entire week without making some kind of holiday announcement, wouldn't it?
Sarcasm aside, Tuesday is another Hong Kong public holiday in recognition of the Buddha's birthday. For any of you that conduct business in any way through Hong Kong, be noted that the most non-retail businesses will not be open this coming Tuesday, May 10. This includes internet banking.
Commercial activities, including our Hong Kong facility, will all be closed on the 10th, reopening on the 11th (Wednesday).
Fortuntately, this is the last one for a while.
| |
White Horse Laboratories (China) Suite 809 Dynamic World
Zhong Han Road, Futian District, Shenzhen
China |
|
Notes:
1. Statistics are calculated as a percentage of all lots dispositioned within the given time period.
2. "Accept" is defined as customer acceptance of report device condition.
3. "Pass" is defined as meeting electrical parameters defined by the agreed upon test plan. | |
|
|
|
We hope you find this report informative and usefull for your organization.
All the best,
Mark A. Rinehart White Horse Laboratories |
|
|
|
|
|
|