|
Week 3 Quality Report
Physical Inspection - 63% Accepted
Electrical Testing - 85% Passed
In the third week of 2011, White Horse facilitated USD50,819.00 in reliable component purchases.
The third week of the New Year there was a dramatic jump in electrical testing results, with three lots having higher than a 1% failure rate. Similarly, Physical Inspection quality levels gained, although not as significantly as for Electrical Testing.
- Maxim MAX3430ESA, 100% failure (Date Code 0937) - high leakage current.
- Infineon BAS21UE6327, 2.5% failure (no date code marked on label or devices) - low breakdown voltage.
- Infineon ITS716G, 2% failure (mixed date codes - 1016, 1022, 1024, 1026, 1032, and 1036) - no output in one or more channels.
|
|
White Horse Laboratories Lunar New Year Holiday Announcement
Our Shenzhen operations will be closed from February 2nd, reopening on February 9th.
Our Hong Kong facility will be closed on February 2nd, reopening on February 7th. |
| | Aili Zhu - Customer Service | |