Logo
Miracle Valley Up-Date
MIRACLE VALLEY CHILDCARE CENTER
November 13, 2006
Greetings!
I saw on the news recently where some officials would like to replace your passport with a special chip that can be inserted into your hand. This special chip would have the necessary information required by officials.

All of this, along with many other things, simply point to the soon coming of our Lord Jesus Christ. Time is simply running out. What we do, we must do quickly.

Currently, the county officials have given us basically a free hand in getting Miracle Valley up-to-date. However, this open window is only good through next August 2007. After that, we will be obligated to meet all the criteria, including large fees, which the county requires. We must take advantage of this opportunity that is afforded us.

By the help and grace of God, we would like to have the buildings at Miracle Valley totally restored by its 50th anniversary. Now Miracle Valley was founded in January 1958 by Evangelist A. A. Allen. In 2008, Miracle Valley will be 50 years old. Will you help us meet this deadline? We need your help, both physically and financially, if we are to be successful in restoring Miracle Valley. Help us to make this endeavor successful so that Miracle Valley will be an asset to our society by the training of young men and women into the ministry so there might be hope for our nation and our churches.

Rose Hill
Church Built by Dr. Harter
In the 1970s, Brother & Sister Harter served as State Evangelists for the Church of God (Cleveland, TN). They traveled extensively, preaching the gospel, winning souls to Christ, and bringing revival to the local churches.

Then in 1975, Overseer Billy Bennett requested that Brother Harter pray about accepting a pastorate. When Brother Harter went to look at the old dilapidated church, originally built in 1854 and pray about it, all of a sudden, Melvin Harter heard God (seemed like a literal voice) speak to him a second time in his life. That voice said, "I have called you here to build a church for My glory."

Knowing God had spoken to them, Dr. & Mrs. Harter labored and built this church for the glory of God. Although starting with just 9 people, a record attendance was set at 676. This is an octogon church seating 500 on the main floor and a five-sided balcony that accompanied an additional 250 people.

It wasn't an easy task; instead, very difficult. However, Dr. Harter knew that God had called him to his task. Money was difficult to obtain, and it required hard work from the Harters. This church was built on faith.

God showed Dr. Harter how to do it. A childcare center was established, which in turn, brought many new families into the church. Finances also began to come, and an all-time record were established.

MIRACLE VALLEY - While in the Prayer Tower, God showed Dr. Harter that His same concept would work at Miracle Valley. Miracle Valley would be involved in the local community providing necessary childcare services as well as reaching people for Jesus Christ. And in addition, the finances will come. These finances will help sustain Miracle Valley's future.

Old DC1
Old Day Care
This is where it all began, back in 1999 when Dr. Harter arrived at Miracle Valley.

This building initially consisted of eight rooms and was built by Rev. A. A. Allen in the late 1960s. This was his Sunday School Department.

Later, when the property was under the control of the Southern Arizona Bible College, half of the building was opened up, thus making it one open room. The building was then utilized as a college chapel and additional administrative offices.

In 1999, the building was in dire need of repair and remodeling. There was no insulation, resulting in the building either being too hot or too cold. The old furnace was not usable, and there were many leaks in the ceiling due to the bad roof that desperately needed to be replaced.

DC workers1
Volunteers from Church in Blue Island, IL
Rev. Peter Contreras, Pastor of Bethel Pentecostal Church in Blue Island, IL (a former alumni of Miracle Valley Bible College under Rev. A. A. Allen) brought 24 volunteers arrived from his congregation to devote one week of work to Miracle Valley.

There was a lot of work that was done by 24 people in a short period of time. This picture shows some of the volunteers sawing and constructing new 2X4 walls.

Pastor Peter Contreras and his wife, Phyllis visit Miracle Valley about four times each year. Miracle Valley had made such a tremendous impression upon the Contreras that they want to give something back, and see Miracle Valley fully restored again.

Would you like to see Miracle Valley restored again? Would you like to be a part of its restoration? We have a dire need for electricians, carpenters, common laborers, and etc. Why not telephone Miracle Valley and make your plans to come?

dc walls
Walls Go Up
Two by four walls are constructed along the interior of the outside walls.

The plan is to have new electrical wiring and insulation installed. Following this, drywall will be screwed to the two by fours.

In addition to the exterior walls, the same process will be applied to the ceiling.

In order to maintain the proper temperature at all times, and keep our overhead costs low, we must insulate the entire building.

DC Big Rm
Insulation Installed
It takes a lot of insulation to complete this task.

This picture shows the insulation is being installed throughout the building.

This will save many dollars in the utility costs each month, and overall, it will be a large savings to Miracle Valley.

DC big rm drywall
Drywall & Taping
Once the new electrical wiring is installed, along with the proper R-factor put into place, the drywall is then screwed onto the 2X4s.

The center posts in the large room area are brought up-to-date and made modern as well.

DC Big room new
Finished Product
The work is nearly completed. The building has been insulated, new electrical wiring installed as well as a new furnace.

The drywall has been put on the walls and it is completely painted. The carpet is installed and the building is now ready for childcare equipment.

Many who have seen the finished product have expressed their feeling to the fact that the building is beautiful. Those who seen the building in its prior condition are literally amazed as to what it has become.

DC Back
Building Must Have Porch
The building requires a porch to be added onto it. In addition, two new exterior doors must be added to the rear of the building as well.

As seen in this picture, the building was constructed in the late 1960s without a porch.

Day Care Porch
Porch Constructed
It took a lot of hard work, but it is finally completed. Praise God!

This picture shows a new porch constructed to the building. Also, two new exterior doors were cut out in the exterior wall.

dc old roof
Old Shingles Removed
If something is to be done, then it should be done right.

During the past years, roll roofing and shingles have been installed on the roof. No doubt, due to the lack of funds, there was nothing else that could be done.

The roof must be stripped of all the shingles and existing roofing material. Rotten wood would need to be replaced. New felt paper would then be installed, and this is followed by a metal roofing material being placed onto the structure.

Day Care Roof
New Metal Roof
New metal roofing material has been installed on the roof. All of the existing swamp coolers were removed. New air-conditioning will later be installed throughout the facility.

Here is a picture of the finished product. Praise God! The building is completed.

So often in the past, we were heart-broken when it rained on this building. But we can now sing, "Send Down The Rain, Lord" because there are no leaks in this building.

Please remember that we have placed new metal roofing material on three buildings; however, we still have several others to do such as the tabernacle and the dormitories.

Will you please consider helping us financially and by volunteering? We need your help!


Personal Message From Dr. Melvin Harter
Dr. Melvin Harter
Friends, without your prayers, your sacrificial financial support, and the labor of our volunteers and others that we have to pay, this building would not be where it is today.

I just want to say from my heart that on behalf of myself and Sister Harter, as well as our staff here at Miracle Valley, we sincerely and humbly thank you for standing with us here at Miracle Valley.

Just as God has called me to this work at Miracle Valley, God has called you to stand with me.

This is an "End-Time" work that must be completed as soon as possible. Many today have invested tremendous sums of money and time into what God wants done at Miracle Valley.

Would you like to be a part of what God is doing today? Please prayerfully consider being a partner with Miracle Valley.

Remember, everyone who has contributed at least $1,000 to the remodeling of this building, their name will be placed on a bronze tablet that will be mounted on the front wall of this building.

We still need a playground fence and additional equipment for the childcare center. Perhaps you would like to contribute to these items and have your named added to the bronze marker?

We are a 501(c)3 non-profit organization that is registered with the United States Government and the Internal Revenue Service.

Every financial gift is tax-deductable. If you would like for it to apply to your 2006 tax form, you need to make your financial donation before the end of this year.

May the Lord richly bless you is our prayer.

Upcoming Events
Big Thanksgiving Dinner with the Turkey and all the trimmings
Noon November 23, 2006 in the Miracle Valley Cafeteria
Fall Revival Service Being Planned
We will let you know the exact dates later
Will You Help Us?
Friends, we need your help. There are several other buildings that must be brought up-to-date in order for Bible College students to come. Stand by Dr. Harter so Miracle Valley will be an on-going school and ministry until our Lord Jesus Christ comes again. Please let us hear from you right away. God's richest blessings be yours.
Contact Info
Description/Title Dr. Melvin Harter 520-366-1000 miracleoffice@yahoo.com

Email Marketing by