May 1, 2012

Kiwanis of Pointe Coupee

Host Annual Blessing of The Boats

 

 

May 27, 2012

Morrison Parkway Public Boat Dock

New Roads, LA  70760

 

 

 

 Time:   2:00 p.m.  

 

 

 

 

    

 

 Special Thanks Goes To Mr. Kenneth St. Romain for Hosting The Kiwanis of Pointe Coupee Blessing of The Boats Event Each Year

  

 

 

 

   For More Information Contact:  (225) 638-6008  

 

Treasures of Pointe Coupee Organizers Seek Artists for 2012

Treasures of Pointe Coupee Logo

 

Organizers of the 2012 Treasures of Pointe Coupee exhibit are beginning their recruitment of artists to participate in this year's event. Following two tremendously successful community art exhibits in June of 2010 and 2011 that drew hundreds to the Julien Poydras Museum and Arts Center to appreciate nearly 150 pieces of art by almost 100 local artists, the steering committee anticipates another outstanding exhibit.

 

This year's event is slated for June 1 to June 3 and will include both two and three dimensional artwork. The 2012 Treasures of Pointe Coupee will include an exhibit from 6 p.m. to 9 p.m., Friday, June 1, with a reception for artists and the public. The exhibit will continue on Saturday, June 2, from 10 a.m. to 5 p.m. and from 10 a.m. to 2 p.m. on Sunday, June 3.

 

A silent auction will be held on Friday evening featuring artworks donated by participating artists, with proceeds going to support future Treasures of Pointe Coupee events. Artists interested in donating work should contact Blanche Jewell, (225) 638-6430.

 

Similar to last year, Saturday's activities will include art demonstrations held in the annex room of the Poydras Center. Also on Saturday, artists will be allowed to sell additional pieces of art in an arts market. Additional details about these aspects of the exhibit will be released shortly.

 

Organizers have sent submission forms to artists who have participated in previous shows, but encourage other artists to consider being a part of the 2012 exhibit. Submission forms will be available at the Pointe Coupee Office of Tourism on Hospital Road or by contacting Treasures chairperson Blanche Jewell at 225 638-6430. Artists who participate in the art show can be professional or amateur, local or not, although local artists are not limited as to their subject matter, while those from outside the parish must have a Pointe Coupee inspired theme.

 

Special  thanks goes to Mrs. Gale Roy for submitting this article and providing the Pointe Coupee Parish Tourist Commission these photos!

 

Pictures from 2011 Treasures of Pointe Coupee Art Exhibit

 
 

Special Goes To Mrs.Gale Roy for Providing Tourism With This Article and For Always Keeping Our Organization Posted on Their Current Events.

Pointe Coupee Parish Road Update

Project Engineer:   Keith Palermo

  

Pointe Coupee Parish Road Update Project Engineer:   Keith Palermo

Project Description: 737-96-0065
 
Drain Cleaning & Interstate Sweeping Cost: $842K Parish: Districtwide Contract Time: Renewable Contractor: Sweeping Corp. Project Start Date: March 28, 2008 Anticipated Completion Date: N/A  Length of project: N/A N/A Project Overview: Districtwide drain cleaning and sweeping of interstate routes, and related work Current Work: A change order was approved adjusting the quantities of inlets cleaned.
 

Project Description: H.001253     LA 1 Morganza Spillway Bridge Rehab Cost: $2.7M Parish: Pointe Coupee Contract Time: 151 Calendar Days Contractor: Gibson & Assoc. Project Start Date: Unknown   Anticipated Completion Date: March 2, 2012   Length of project: 0.790 miles  0.0 Project Overview: Remove existing finger joints and replace with polymer concrete nosing; repair bridge railing, deck concrete repair and epoxy overlay; clean and paint existing bearings and saddles, install new saddles; and related work. Current Work: Work on the bridge joints is nearing completion.  A change order is being drafted to compensate the contractor for time lost due to cane season.

 

Project Description: 008-02-0034 Left Turn Lanes at LA 77 & LA 78/411 (US 190) & 008-03-0060 Cost: $4.7M Parish: PointeCoupee Contract Time: 335 Calendar Days Contractor: Gilchrist Const. Project Start Date: January 31, 2011     Anticipated Completion Date: January 30, 2012  Length of project: 0.538 miles 3.0 Project Overview: Grading, Drainage Structures, Cold Planing Asphaltic Pavement, In-Place Treated Base Course, Superpave Asphaltic Concrete Pavement, and related work Current Work: Curb & gutter work, and permanent striping is underway.  A change order is being written to compensate the contractor for days not worked.

 

 Project Description: 737-96-0065, PO#4400000778   Drain Cleaning & Sweeping Cost: $842K   Parish:Districtwide   Contract Time: Renewable Contractor: Sweeping Corp. Project Start Date: March 28, 2008 Anticipated Completion Date: N/A Complete: N/A Length of project: N/A % Time elapsed: N/A Project Overview: Districtwide drain cleaning and sweeping of interstate routes, and related work Current Work: A Change order was approved adjusting the quaniities of inlets cleaned. 

 

Project Description: 227-04-0018, H.00218   LA 414S -8.84MI North (LA 413)       Cost: $6.4M Parish: Pointe Coupee Contract Time: 165 Working Days     Contractor: F.G. Sullivan, Jr. Project Start Date: November 14, 2011 Anticipated Completion Date: November 12, 2012     Length of project: 11.77 miles Project Overview: Grading, drainage structures, cold planning asphaltic concrete, lime treatment, in-place cement stabilized base course, superpave asphaltic concrete overlay, and related work. Current Work: Drainage work is currently underway.  Cold planing is expected to begin shortly.

 

Project Description:052-04-0015, H.001255 LA 1 Gateway Enhancement Cost: $122K Parish: Pointe Coupee Contract Time: 30 Working Days  Contractor: PC Parish Police Jury Project Start Date: November 20, 2011  Anticipated Completion Date: February 20, 2012   Length of project: 0.270 miles  Project Overview: Consultant project (ERM); Landscaping and related work. Current Work: Waiting for contractor to have certified Traffic Control Supervisor on site before beginning construction.

 

Jim (James White)

Eng. Tech 7

"King of the Road"

 

 

Special Thanks To Mr. James White For Always Providing Tourism With The Road Update.

In This Issue
False River Tuesday Night Fishing Touraments and Friday Night Cookie Jar Tournaments
Treasures Of Pointe Coupee Art Exhibit
Kiwanis of Pointe Coupee Annual Blessing of the Boats
Upcoming June Events

Tourism Logo

Office of Tourism 

 

P.O. Box 733
727 Hosptial Road, Suite B
New Roads, LA 70760 
  
 
Phone:   
(225) 638-3998 
 
 
Quick Links: 
Calendar of Events  

Greater Pointe Coupee Chamber of Commerce 

The Pointe Coupee Banner 

Town of Fordoche 

Pointe Coupee Parish Library   

Pointe Coupee Parish Sherrif's Office  

Pointe Coupee Parish Policy Jury  

 

 

 

Other May Events 

 

 

 

False River Tuesday Night Fishing Tournaments

 

 

Every Tuesday Night
 
False River Cookie Jar Fishing Tournaments
Every Friday Night
 
Pet Adoption Day
May 12, 2012
New Roads, LA 70760

 

 

Upcoming

June Events 

  

 

False River Tuesday Night

Fishing Tournaments 

Every Tuesday Night
  
False River Cookie Jar Fishing Tournaments
Every Friday Night
 
New Roads Multi-Use Center Events
Baton Rouge Barrel Race Competititon
June 9, 2012 
New Roads Multi-Use Center
1400 Major Parkway
New Roads, LA 70760
 
Pet Adoption Day
June 9, 2012
Wal-mart Parking Lot
New Roads, LA 70760
 

 

Treasure of Pointe Coupee Art Exhibit

June 1, 2, & 3, 2012

JPMAC Auditorium

500 W. Main Street 

New Roads, LA  70760

  

New Roads Multi-Use Center Events
Baton Rouge Barrel Race Competititon
June 9, 2012
New Roads Multi-Use Center
1400 Major Parkway
New Roads, LA 70760

 

New Roads Multi-Use Center Events
June 16, 2012
Louisiana Stock Horse Association Competition
New Roads Multi-Use Center
1400 Major Parkway
New Roads, LA 70760
 
South Louisiana Cutting Horse Association
June 29 & 30, 2012
New Roads Multi-Use Center
1400 Major Parkway
New Roads, LA 70760
  
 Pick Your Passion