March 1, 2012

2nd Annual Clevy David and Christy Roy ALS Fundraiser Bass Fishing Tournament

 


 

March 3, 2012

Morrison Parkway Public Boat Dock

New Roads, LA  70760

 

Time:  Safe Daylight - 3:00 p.m.

 

  

 

1st Place Winner Guaranteed

$1,000.00

 

For More Information Contact:

(225) 505-6681 or (225) 638-8584

 

 

All Proceeds Will Benefit

 ALS Foundation

Visit:  http://webla.alsa.org/site/PageServer?pagename=LA_homepage

 

 March Events
Hosted By 
New Roads Multi-Use Center 
 

 Baton Rouge

Barrel Race Competition 

March 3, 2012 

  

 National 

Barrel Race Competition

March 12, 2012

 

Baton Rouge 

Barrel Race Competition

March 21, 2012  

 

Kevin Simoneaux Roping 

 

Competition  

 

March 24, 2012 
 
Baton Rouge

Barrel Race Competition

March 31, 2012 

 

Special Thanks To:

 

 Mr. Weldon Jewel for Providing us With All New Roads Multi-Use Center Events and Wilmer D. Moore for the Picture

3rd Annual

New Roads Spring Street Festival

 

 

Date:  March 17, 2011

 

Time:  9:00 a.m. - 3: 00 p.m.

 

Place:  Main Street, New Roads, LA

 

For More Information Contact: 

(225) 638-5360 ext. 212

&

Steve Kent Trucking, Inc.

 

Kiwanis of Pointe Coupee,

Maggio GMAC, Elite Solutions, & Steve Kent Trucking, Inc. Sponsors Annual Bass Fishing Tournament

 

Date:  March 18, 2012

Place:  Morrison Parkway

New Roads, LA  70760

 

Time:  Safe Daylight to 3:00 p.m.

 

For More Information Contact: 

(225) 638-6008

 
11th Annual Fordoche Fair
 
 
Dates:  March 22, 23, & 24, 2012
 
Place:  Ryan Shoupe Park
Fordoche, Louisiana 70732
 
Festivities Include:  Rides, Live Music, Jambaylaya Cook-off, Karaoke, Food, Refreshments, and So Much More! 
 

Pointe Coupee Parish Road Update

Project Engineer:   Keith Palermo

  

Pointe Coupee Parish Road Update Project Engineer:   Keith Palermo

Project Description: 737-96-0065Drain Cleaning & Interstate Sweeping Cost: $842K Parish: Districtwide Contract Time: Renewable Contractor: Sweeping Corp. Project Start Date: March 28, 2008 Anticipated Completion Date: N/A  Length of project: N/A N/A Project Overview: Districtwide drain cleaning and sweeping of interstate routes, and related work Current Work: A change order was approved adjusting the quantities of inlets cleaned. 

Project Description: H.001253     LA 1 Morganza Spillway Bridge Rehab Cost: $2.7M Parish: Pointe Coupee Contract Time: 151 Calendar Days Contractor: Gibson & Assoc. Project Start Date: Unknown   Anticipated Completion Date: March 2, 2012   Length of project: 0.790 miles  0.0 Project Overview: Remove existing finger joints and replace with polymer concrete nosing; repair bridge railing, deck concrete repair and epoxy overlay; clean and paint existing bearings and saddles, install new saddles; and related work. Current Work: Work on the bridge joints is underway. 

Project Description: 008-02-0034 Left Turn Lanes at LA 77 & LA 78/411 (US 190) & 008-03-0060 Cost: $4.7M Parish: PointeCoupee Contract Time: 335 Calendar Days Contractor: Gilchrist Const. Project Start Date: January 31, 2011     Anticipated Completion Date: January 30, 2012  Length of project: 0.538 miles 3.0 Project Overview: Grading, Drainage Structures, Cold Planing Asphaltic Pavement, In-Place Treated Base Course, Superpave Asphaltic Concrete Pavement, and related work Current Work: Concrete work is underway on barriers and approach slab. 

Project Description: 737-96-0065, PO#4400000778   Drain Cleaning & Sweeping Cost: $842K   Parish:Districtwide   Contract Time: Renewable Contractor: Sweeping Corp. Project Start Date: March 28, 2008 Anticipated Completion Date: N/A Complete: N/A Length of project: N/A % Time elapsed: N/A Project Overview: Districtwide drain cleaning and sweeping of interstate routes, and related work Current Work: A Change order was approved adjusting the quaniities of inlets cleaned. 

Project Description: 227-04-0018, H.00218   LA 414S -8.84MI North (LA 413)       Cost: $6.4M Parish: Pointe Coupee Contract Time: 165 Working Days     Contractor: F.G. Sullivan, Jr. Project Start Date: November 14, 2011 Anticipated Completion Date: November 12, 2012     Length of project: 11.77 miles Project Overview: Grading, drainage structures, cold planning asphaltic concrete, lime treatment, in-place cement stabilized base course, superpave asphaltic concrete overlay, and related work. Current Work: Silt fencing is being installed.

Project Description:052-04-0015, H.001255 LA 1 Gateway Enhancement Cost: $122K Parish: Pointe Coupee Contract Time: 30 Working Days  Contractor: PC Parish Police Jury Project Start Date: November 20, 2011  Anticipated Completion Date: February 20, 2012   Length of project: 0.270 miles  Project Overview: Consultant project (ERM); Landscaping and related work. Current Work: Waiting for contractor to have certified Traffic Control Supervisor on site before beginning construction.

 

Jim (James White)

Eng. Tech 7

"King of the Road"

 

 

Special Thanks To Mr. James White For Always Providing Tourism With The Road Update.

In This Issue
2nd Annual Clevy David and Christy Roy ALS Fundraiser Bass Fishing Tournament
Pointe Coupee Parish Multi Use Center Current and Upcoming Events
3rd Annual New Roads Spring Street Festival
Kiwanis of Pointe Coupee Bass Fishing Tournament
11th Annual Fordoche Fair
Other March Events
Upcoming April Events

Tourism Logo

Office of Tourism 

 

P.O. Box 733
727 Hosptial Road, Suite B
New Roads, LA 70760 
  
 
Phone:   
(225) 638-3998 
 
 
Quick Links: 
Calendar of Events  

Greater Pointe Coupee Chamber of Commerce 

The Pointe Coupee Banner 

Town of Fordoche 

Pointe Coupee Parish Library   

Pointe Coupee Parish Sherrif's Office  

Pointe Coupee Parish Policy Jury  

 

 

 Other

Important

March Events

 

Hearts-A-Fire

March 2, 2012

Arts Council Logo-2

JPMAC Auditorium

New Roads, LA  70760

 

Nell's Angels Couchon de Lait

March 3, 2012

Fordoche, LA  70732

 

 

Pet Adoption Day

  

St. Ann Catholic Church St. Joseph Altar

March 18, 2012

Morganza, LA  70759

St. Joseph Altar  And Cooks Photo

 

Oxbow Triathlon

March 24, 2012

Morrison Parkway

New Roads, LA  70760

 

Last Friday Film Day

March 30, 2012

JPMAC Auditorium 

New Roads, LA  70760

 

 

March 12, 2012

Wal-mart Parking Lot

New Roads, LA  70760

 

Pelican Music Concert

March 18, 2012

JPMAC Auditorium

New Roads, LA 70760

 

 

Upcoming

April Events 

 

 

Les Bon Vieux Temps Sur Le Chenal; Immaculate Conception Annual Church Fair, Lakeland, LA
April 21, & 22, 2012
 
New Roads Multi-Use Center Events
National Barrel Race Competititon
April 24, 2012
 
Louisiana Stock Horse Association
April 28, 2012

 

 

Biggest Bench Press on False River

April 28, 2011 

 

 


 

 


 


  

 

 


 Pick Your Passion