Valmont Update
Thank for your patience during the design, development and construction of Valmont Bike Park. BMA has been working in tandem with the City of Boulder Parks and Recreation Department, and we are very excited about what is right around the corner. Your generosity has made a large impact, and we sincerely thank you for the above and beyond donations.
The Parks Department, as the landowner, is working tirelessly to get the project done within budget, and as soon as possible. I am sure you will be disappointed the park is not opening this fall, but the wait will be well worth it. We cannot commend the Park Department enough on their work. There are many layers of complexities in the construction, and they have met the challenges well. We are grateful for their efforts. Please read the statement they issued below for the status and opening dates.
BMA would like to address an issue that has negatively impacted an already tight construction schedule and budget. Numerous incidents of poaching (trespassing) have occurred, and the ramifications are causing delays, damage, increased costs, and stressing our relationship with the Parks Department. The trails ARE NOT READY TO RIDE, and riding them is requiring the contractors to repair them first, before they can finish them. So it is not harmless poaching, it is causing damage and delays. We cannot emphasize this enough.
Current Project Status
Approximately 50% of the bike park features have been roughed in or completed. Many additional features and elements need to be added or completed before the park can be opened.
Please Note: The bike park site is currently CLOSED to all non-construction access. Entering this site at anytime is trespassing and violators will be ticketed. Many of the park features are not complete and riders attempting to access the park risk personal
injury and damage to the trails, increasing construction delays and resulting in diverting limited funds from park features to repair damages.
Bike Park Improvements Currently Underway
- constructing terrain park features
- constructing restroom facilities
- installing irrigation, landscaping and erosion controls
- grass seed establishment
- obtaining easements, engineering and constructing bridges across irrigation ditches
- improving parking lots
- developing trail maintenance standards and agreements
- developing and installing safety and information signs
Projected Bike Park Opening: Spring 2011 (contingent upon weather)
Again, please DO NOT ENTER or attempt to ride the park until it is opened for public use. We sincerely appreciate your patience and cooperation as we enter the final months of bike park construction.