4 Steps for Septic System Installations

- Site  
-
Design
- Installation
- Use &  Maint.
  
 

Quick Links

Dollars Best Spent:

Test Regularly 
and
Pump Regularly


 

Fact Corner:

The EPA estimates that, in 2007, 26.1 million (20%) of all US households were served by  septic systems. 

Breakdown:
Rural - 50%
Suburb.- 47%
City - 3%



Coming Soon:

Wastewater plans for Cape Cod towns.
 
The Debate:
Centralized vs De-centralized

 

Need a 
consultation?

Contact:

508-255-6511

Our Website

Last Newsletter

Newsletter Archives
Join Our Mailing List
On-Site Septic System History 
For most of human history, sewage disposal largely consisted of discharging directly into rivers, streams, and even streets, along with garbage and all other types of waste.  In the 18th century, indoor plumbing gained widespread appeal in homes and businesses in large cities.   The most common design included a single system of pipes, made of wood or clay and, later on, cast iron, that transported wastewater to sewers and then to convenient waterways - with no treatment.  The next milestone of modern plumbing included the invention of the flush toilet in Britain around 1820.  The first septic tank systems originated in France around 1860 and included an underground concrete tank and a leach field.  Following these innovative conveniences came the adoption of the "sewer system" with Chicago being the first American city to install a city-wide system.  Rural areas, with little access to modernization, continued to depend on outhouses while, in larger cities, the concept of centralized wastewater treatment emerged.  By the early 20th century, municipal sewage treatment systems were common in the UK and in the United States.
Snapshot of an On-site Septic System
3P's
Today's septic systems remain similar in design to those of mid-19th century Europe where they consisted of a tank and a drain or leach field.  Advancements include modernization of leach fields; they are designed for different on-site conditions and to meet local codes.  Historically, pits, chambers, galleries, fields, and trenches have been used.  All take advantage of infiltration of liquid through permeable material.  When waste flows into the septic tank, the heavy solids sink to the bottom to form a layer of sludge.  Lighter materials, notably grease, fats, and small food particles, float on the surface forming a scum layer.  Between these two layers is a  mixture of suspended material and water soluble chemicals.  When a septic tank is properly sized, many of the suspended solids settle out so that primarily liquid passes through to the leaching facility.  As this process advances and solids are broken down, gases (hydrogen sulfide and methane) are produced and vented.  The remaining liquid component flows downstream in a relatively clear condition from the tank to the leach field.  Many of the remaining impurities are trapped and eliminated in the soil.  The excess water is taken up by the roots of plants, percolates down to the groundwater, or is lost to evaporation.
4 Steps to Septic System Peace of Mind
Most on-site septic systems in Massachusetts are regulated under Title 5 of the Massachusetts Environmental Code.  There are many considerations to be made before installing an on-site Title 5 septic system.  The following considerations will help homeowners have years of trouble-free, environmentally-responsible use.

SiteLinkAnchorASite Evaluation: For a septic system to function properly, it is important for the underlying and surrounding soil to have certain characteristcs, most importantly, permeability.  The water-carrying capacity of the soil must be determined before a system can be designed.  A percolation test is performed in accordance with Title 5 methods, where water is poured into the soil to measure the in-place percolation rate.  From this information, the adequacy of the soil to support the liquid discharge from a septic system is determined.  Another critical site consideration is the depth to the watertable.  Title 5 requires that the bottom of the leaching facility (aka soil absorption system) must maintain at least a four foot separation from the groundwater table to provide the minimum treatment through the soil in order to reduce contamination.  Soils with high permeability (percolation rates less than five minutes per inch) must provide at minimum a five foot separation to groundwater.  Engineered solutions can be designed into the system to mitigate the occurrence of unsuitable soils or inadequate watertable separation.

DesignLinkAnchorBDesign:  To prepare a design plan suitable for  review by the board of health, a registered professional civil engineer or sanitarian takes into account the results of the  site evaluation, the proposed use of  the property, and the septic designdesign flow.  The design must allow for setbacks required from existing or proposed structures, property lines, drinking water wells, wetland resources,  and the groundwater table.  The design will specify sizes and materials for the components, specific locations, elevations of key outlets and piping, and methods of installation.  For difficult sites, the engineer can design measures to mitigate problems, i.e. removal of unsuitable soil, creation of a mounded system to provide adequate groundwater separation, or a pumping system to move the effluent where gravity alone will not work.  In some cases, a small treatment plant can be designed for site-specific conditions or  where other considerations must be accounted for.  A properly designed septic system plan will satisfy Title 5 requirements.

InstallationLinkAnchorCInstallation:  Once the design has been approved, a septic installation contractor uses the plan to install the system.  If the installer follows the plan, putting the components where shown on the plan and uses the materials and methods specified, the system should operate properly.  However, the installer must be meticulous in setting the components, piping, inlets, and outlets at the specified elevations.  Most on-site systems use gravity to convey flow from the house to each component and finally to the septic installleach field.  Setting components out of level interrupts normal flow and can cause significant problems.  Pipe connections and couplings must be sealed properly to prevent leaks and possible root infiltration.  The septic tank itself must be level and water tight.  The consequences of inadequate installation can cause problems that may result inhealth risks, expensive repairs, and the spread of contamination.
 
MaintenanceLinkAnchorDUse and Maintenance:  A professional engineer or sanitarian designs a proper septic system based on site conditions and proposed use.  Likewise, a septic system installer  installs the system by following the design plans and using approved materials and methods.  Once the system is in the ground, the key to long, trouble-free use rests with the owner.  The difference between out-of-sight-out-of-mind performance and system failure is the implementation of an effective wastewater management program.  Small efforts on a regular basis can save a lot of money and significantly prolong the life of the system.

The most obvious septic system failures are easy to spot: pooling water or muddy soil around the septic system or in the basement, water backing up in the toilet or other house drains, foul odors, or sptic failurestrips of bright green grass over the leach field.  The causes of these failures include excessive water use, discharge of inappropriate or toxic substances such as paints, solvents, cleaning agents, non-biodegradable paper and plastics, and, in some cases, vegetation planted over the system. 

Inadequately treated wastewater can contaminate drinking water and thus transfer diseases to animals and humans.  Failing systems also leak excessive nutrients and bacteria to lakes and marine waters, destroying plant and animal habitat, and closing beaches.  To help prevent a septic system from failing, the owner must be vigilant to prevent the discharge of inappropriate substances.  The single most important measure that can prolong the life of the system is to inspect the septic tank and have it pumped regularly.  If a problem is suspected, a licensed Title 5 inspector can check the system and make recommendations for pumping or repair.  With or without a full septic inspection, pumping the septic tank every two to three years, depending on the amount of use, can prolong the life of the leaching facility, thus providing years of trouble-free service.  Preventive maintenance is much more economical than repair or replacement.
 
It could cost up to $40,000 to replace a failed system versus up to $400 for a full inspection or approximately $250 to have it pumped.  A small effort on a regular basis can save money and significantly prolong the life of the system.

CentralizedLinkAnchorECentralized v. De-centralized Sewer Debate
As Cape towns develop their individual Comprehensive Waste Management Plans, the debate between constructing town-wide centralized sewer systems versus installing de-centralized cluster systems rages on.  Town leaders are being urged to re-evaluate the data and balance the science and available technologies with the costs and effectiveness of the different methods.  An upcoming issue of Coastal Currents will examine this topic, present a "Pro and Con" discussion, and provide a better understanding of both sides of this important issue.
 
~ Todd J. Palmatier, Hydrogeologist
 
Coastal Engineering Company
Coastal Engineering Company, Inc.
260 Cranberry Highway
Orleans, MA  02653
508-255-6511
www.coastalengineeringcompany.com