|
Priority Work to Fix Up the Church and Children's House
Outside Maintenance ask neighbor to move shrub so sign will be visible designate where parking will be for first month mark parking and handicap parking
Painting finish painting the rooms scrape and clean all exterior windows caulk and paint bead board ceiling paint window sills outside paint quarter round in front room repaint walls in foyer same color in sanctuary (to cover up water damage above entry doors to sanctuary) paint front door of sanctuary (outside) more appealing color paint all vents/return grid
Building Repairs measure and cut glass and replace broken window in front and window panes(Bob) repair closet doors in back room add light fixture in front room cover or replace outlets/child proof get batteries and test smoke alarms install CO2 alarms clean and disinfect bathrooms and kitchen remove doors to entry going into sanctuary repair and paint damage to wall above doors, permanently fix sliding doors in gathering rooms and get rid of black pipes remove swivel doors in sanctuary replace broken kitchen window have screen moved back 4 feet repair wall damage
Inside Clean-up / Decorating get carpet cleaned before putting furniture inside manse place furniture in children's classrooms add more lamps, indoor plants or arrangements(Gregg to check on decorator & florist) remove old art and stage with new décor clean lamps on Front Entrance inside and out put plants in front of speakers move pastor chairs to manse in the entry hall change out bulbs in chandeliers/clean chandeliers clean floor in fellowship hall (sand paper and tape stuck from VBS) clean and update all bulletin boards
|