Construction Update Report for Lake County Roadways
Cemetery Road
- Improvements consist of reconstruction Cemetery Road beginning south of Washington St. to the Tri-State Parkway, reconstructing Tri-State Parkway from east of Cemetery Road to south of IL Route 132 and the installation of a traffic signal at the Cemetery Rd. and Washington St. intersection. Estimated completion 5/20/2011.
Fairfield Road - Resurfacing from IL Rte. 176 to Old McHenry Road in Ela Township and Fremont Township. Estimated completion 11/2010.
IL 137 at 7th St. -and on 7th St. in Winthrop Harbor - Resurfacing, street lighting and landscaping from Whitney Ave. to Union Pacific Railroad tracks. Estimated completion 12/2010.
IL 173 in Wadsworth - Resurfacing from 0.1 mile east of I-94 to 0.1 mile west of IL 131. Estimated completion 10/20/10.
IL 59 in Fox Lake - Bridge deck overlay on the structure carrying IL 59 over Squaw Creek. Estimated completion 11/2010.
IL 83 in Grayslake and Round Lake Beach - Resurfacing from south of Rollins Rd. to IL Route 137 (Antioch Rd.). Estimated completion 11/2010.
IL 59 in Fox Lake - Resurfacing from U.S. Route 12 to Grand Ave. (IL Route 132). Estimated completion 11/2010.
IL 83 in Mundelein, Grayslake, Round Lake Park - Resurfacing from IL Route 176 to IL Route 137.
Lake Street in Grayslake - Resurfacing, sidewalk, curb and gutter from IL Route 120 to Center Street. Estimated completion 10/2010.
Lotus Dr/Oakwood Dr. in Round Lake Beach - Construction of new sidewalks, handicap access, storm sewers on Lotus Dr. from Long Lake to Golfview Dr. and on Oakwood Dr. from Fairfield. Estimated completion 11/2010.
US 45 in Grayslake, Third Lake - Reconstruction adding lanes and traffic signal modernization from IL Route 120 to Jeffrey St. Estimated completion 11/2011.
US 45 in Grayslake - Reconstruction and widening to a 4-lane divided section with turn lanes from IL 137 (Buckley Rd.) to south of IL 120 (Belvidere Rd.). Estimated completion 11/2010.