Special Monday Report
Utah Stimulus Projects March 16th, 2009


Utah Economic Stimulus Projects


 
Greetings!
  • Utah Economic Stimulus Projects
  • Economic Stimulus - Utah Projects

    IndustryProject Name Estimated CostCity
    IT / TelecommunicationsCompletion of an open-access fiber optic telecommunication network in partnership with 15 other Utah cities. $5,982,685.00 Brigham City UT
    Construction Services and Building Supplies Compost Facility Transfer Station & Recycling Center $24,000,000.00 Brigham City UT
    Construction Services and Building Supplies Academy Square Project $20,000,000.00 Brigham City UT
    Construction Services and Building Supplies City Hall & Public Safety Building $15,000,000.00 Brigham City UT
    Construction Services and Building Supplies Sports Park $15,000,000.00 Brigham City UT
    Construction Services and Building Supplies 1200 W. Forest to 1100 S. $8,300,000.00 Brigham City UT
    Construction Services and Building Supplies Sidewalks entire town $4,700,000.00 Brigham City UT
    Construction Services and Building Supplies Piping Cement Ditch Mantua $3,100,000.00 Brigham City UT
    Construction Services and Building Supplies Trail System $2,800,000.00 Brigham City UT
    Construction Services and Building Supplies Water Radio Read Meters, Service Replacement, Security & Telemetry $2,600,000.00 Brigham City UT
    Construction Services and Building Supplies 2 million gallon north end concrete water storage reservoir $2,200,000.00 Brigham City UT
    Construction Services and Building Supplies Airport Taxiway $1,500,000.00 Brigham City UT
    Construction Services and Building Supplies Main Street Sidewalk Rehabilitation & Irrigation project (downtown) $700,000.00 Brigham City UT
    Construction Services and Building Supplies Waterline 1200 W. 6 N. to Forest St. $550,000.00 Brigham City UT
    Construction Services and Building Supplies 400 N. Bridge Replacement $400,000.00 Brigham City UT
    Construction Services and Building Supplies Waste Treatment Plant Telemetry $240,000.00 Brigham City UT
    Construction Services and Building Supplies 200 S. Traffic Calming $200,000.00 Brigham City UT
    Construction Services and Building Supplies New City Hall $12,000,000.00 Herriman City UT
    Construction Services and Building Supplies SOUTH HILLS BOULEVARD $5,000,000.00 Herriman City UT
    Construction Services and Building Supplies 5 MILLION GALLON WATER TANK $4,500,000.00 Herriman City UT
    Construction Services and Building Supplies HERRIMAN PARKWAY EXTENSION $4,000,000.00 Herriman City UT
    Construction Services and Building Supplies PRESSURIZED IRRIGATION PIPELINE $3,500,000.00 Herriman City UT
    Construction Services and Building Supplies 5600 WEST PROJECT $2,500,000.00 Herriman City UT
    Construction Services and Building Supplies REMEDIATION OF CONTAMINATED $2,500,000.00 Herriman City UT
    Construction Services and Building Supplies 13400 SOUTH WIDENING $2,000,000.00 Herriman City UT
    Construction Services and Building Supplies MAIN STREET WATERLINE & PUMP $2,000,000.00 Herriman City UT
    Construction Services and Building Supplies 16" WATERLINE TO TANK $1,800,000.00 Herriman City UT
    Construction Services and Building Supplies 6000 WEST WIDENING $1,300,000.00 Herriman City UT
    Construction Services and Building Supplies REGIONAL DETENTION POND $800,000.00 Herriman City UT
    Construction Services and Building Supplies MIDAS CREEK BRIDGE $750,000.00 Herriman City UT
    Construction Services and Building Supplies Kentucky Avenue and Holladay Blvd. Intersection Realignment $5,000,000.00 Holladay UT
    Construction Services and Building Supplies Holladay Village (downtown) Roadway Reconstruction Supplemental Funding to complete project. Work includes roadway reconstruction, powerline burial, soils contamination mitigation, streetscape and other incidentals. $1,500,000.00 Holladay UT
    Construction Services and Building Supplies Indian Rock Storm Drain / Irrigation $700,000.00 Holladay UT
    Construction Services and Building Supplies Upper Canal Regional Flood Control Facilities Bank Stabilization Flood control structures, and related work $550,000.00 Holladay UT
    Construction Services and Building Supplies Wayman Storm Drain Phase II Casto Lane Extension / Irrigation Separation $400,000.00 Holladay UT
    Construction Services and Building Supplies "Cottonwood Loop" Street Lighting Upgrade Replace approx 120 incandescent street light fixtures on antiquated series loop with new LED $85,000.00 Holladay UT
    Construction Services and Building Supplies Wren Hollow Flood Control / Storm $85,000.00 Holladay UT
    Construction Services and Building Supplies 5900 South $3,675,488.00 Murray UT
    Construction Services and Building Supplies Street Waterline $1,726,775.00 Murray UT
    Construction Services and Building Supplies 4800 South $1,605,450.00 Murray UT
    Construction Services and Building Supplies Street Sewer Line $875,000.00 Murray UT
    Construction Services and Building Supplies Landfill gas project with Trans-Jordan Landfill to produce between 4 to 7 megawatts of power as a 24/7 green resource. Infrastructure to provide power to the grid and to city power $500,000.00 Murray UT
    Construction Services and Building Supplies Water line improvements on Avalon Dr. from 5300 South to 5600 South $349,650.00 Murray UT
    Construction Services and Building Supplies Water line improvements on Kenwood Dr. Avalon to Avalon $265,000.00 Murray UT
    Construction Services and Building Supplies Sewer line replacement on 300 West from 4650 South to 4500 South $250,000.00 Murray UT
    Construction Services and Building Supplies Edison Street Improvements $225,000.00 Murray UT
    Construction Services and Building Supplies Water line improvements on Alpine Dr. from 5300 South to Knollcrest Dr. $196,290.00 Murray UT
    Construction Services and Building Supplies Storm Sewer project on Fairbourne $194,000.00 Murray UT
    Construction Services and Building Supplies Water line improvements on Fireclay Ave. from St. to Main St. $172,000.00 Murray UT
    Construction Services and Building Supplies Water line improvements on Edison St. from St. to Main St. $158,000.00 Murray UT
    Construction Services and Building Supplies Sewer line replacement on Edison St. from to Main Street $153,000.00 Murray UT
    Construction Services and Building Supplies Water line improvements on Montrose from 5300 South to Alpine Dr. $119,205.00 Murray UT
    Construction Services and Building Supplies Storm Sewer project at 5490 S. Vine $56,100.00 Murray UT
    Construction Services and Building Supplies 4800 South Street improvements $33,000.00 Murray UT
    IT / Telecommunications Community Telecommunications $40,000,000.00 Orem UT
    IT / Telecommunications Install cameras 72 cameras installed, one per intersection, between 500 West to 200 East and 200 North to 600 South. $10,000 per camera includes installation, maintenance. 7 officers to $1,216,000.00 Orem UT
    Construction Services and Building Supplies Jim Reams Memorial Highway Improvement Project $20,000,000.00 Orem UT
    Construction Services and Building Supplies Richard Manning Memorial Highway Improvement Project $20,000,000.00 Orem UT
    Construction Services and Building Supplies Widen 400 South, I-15 to Geneva Road $10,000,000.00 Orem UT
    Construction Services and Building Supplies City Center Infrastructure $9,400,000.00 Orem UT
    Construction Services and Building Supplies Library Infrastructure Improvements $9,000,000.00 Orem UT
    Construction Services and Building Supplies 4" Waterline Replacement Project $7,900,000.00 Orem UT
    Construction Services and Building Supplies North Union Canal Trail $7,000,000.00 Orem UT
    Construction Services and Building Supplies Alta Spring Line Restoration $6,000,000.00 Orem UT
    Construction Services and Building Supplies 5 MG Water Tank $5,000,000.00 Orem UT
    Construction Services and Building Supplies Local Street Widening Projects $5,000,000.00 Orem UT
    Construction Services and Building Supplies Water Meter Replacement Program $5,000,000.00 Orem UT
    Construction Services and Building Supplies 1200 North Storm Sewer, 400 East to $4,500,000.00 Orem UT
    Construction Services and Building Supplies Reconstruct and Improve 400 South, 1000 West to Geneva Road $4,500,000.00 Orem UT
    Construction Services and Building Supplies Widen 400 West from 400 North to 800 $4,500,000.00 Orem UT
    Construction Services and Building Supplies Widen 800 West, 400 North to Center $4,500,000.00 Orem UT
    Construction Services and Building Supplies 2000 South/Geneva Road Water Reuse $4,000,000.00 Orem UT
    Construction Services and Building Supplies Widen 1200 West, 900 North to 1600 $4,000,000.00 Orem UT
    Construction Services and Building Supplies 2000 South/Taylor Storm Drain Area $3,500,000.00 Orem UT
    Construction Services and Building Supplies Lindon Hollow Drainage Outfall $3,500,000.00 Orem UT
    Construction Services and Building Supplies Williams Farm Detention Basin $3,500,000.00 Orem UT
    Construction Services and Building Supplies Street Resurfacing Project $3,300,000.00 Orem UT
    Construction Services and Building Supplies Center Street, I-15 to Geneva Road Widening Project $3,000,000.00 Orem UT
    Construction Services and Building Supplies Sidewalk Construction Project $2,800,000.00 Orem UT
    Construction Services and Building Supplies Carterville Road/West Union Canal Trail $2,000,000.00 Orem UT
    Construction Services and Building Supplies 2000 South/Geneva Road Sewer $1,500,000.00 Orem UT
    Construction Services and Building Supplies 2000 South/Geneva Road Water $1,500,000.00 Orem UT
    Construction Services and Building Supplies 400 North, Main Street to 800 East $1,500,000.00 Orem UT
    Construction Services and Building Supplies ATMs Improvements $1,500,000.00 Orem UT
    Construction Services and Building Supplies SCERA Park Storm Drain, 400 East to $1,500,000.00 Orem UT
    Construction Services and Building Supplies Public Facilities Education Resources $1,200,000.00 Orem UT
    Construction Services and Building Supplies Add Right-turn Lanes at 800 South & Orem Boulevard $950,000.00 Orem UT
    Construction Services and Building Supplies Widen 800 South from Orem Boulevard to Street $950,000.00 Orem UT
    Construction Services and Building Supplies Timpanogos Park Facility $800,000.00 Orem UT
    Construction Services and Building Supplies Widen 400 South from Orem Boulevard to Street $750,000.00 Orem UT
    Construction Services and Building Supplies Waste Water Collection Facility Project $700,000.00 Orem UT
    Construction Services and Building Supplies Cascade Spring Line Replacement $600,000.00 Orem UT
    Construction Services and Building Supplies Curb, Gutter & Sidewalk Improvements $600,000.00 Orem UT
    Construction Services and Building Supplies Carterville Pressure Sewer $500,000.00 Orem UT
    Construction Services and Building Supplies Carterville Road Sewer Project $500,000.00 Orem UT
    Construction Services and Building Supplies Main Street, 1430 North to 1600 North $500,000.00 Orem UT
    Construction Services and Building Supplies New Traffic Signal 1200 North & 1200 $500,000.00 Orem UT
    Construction Services and Building Supplies New Traffic Signal 1200 North & 800 $500,000.00 Orem UT
    Construction Services and Building Supplies New Traffic Signal 400 South & 400 East $500,000.00 Orem UT
    Construction Services and Building Supplies New Traffic Signal 400 South & 400 $500,000.00 Orem UT
    Construction Services and Building Supplies New Traffic Signal 800 North & 200 $500,000.00 Orem UT
    Construction Services and Building Supplies New Traffic Signal 800 North & 600 $500,000.00 Orem UT
    Construction Services and Building Supplies New Traffic Signal 800 North & 600 $500,000.00 Orem UT
    Construction Services and Building Supplies New Traffic Signal at 800 East & 1200 $500,000.00 Orem UT
    Construction Services and Building Supplies New Traffic Signal at 800 East & 400 $500,000.00 Orem UT
    Construction Services and Building Supplies Roundabout at 2000 South & Columbia $500,000.00 Orem UT
    Construction Services and Building Supplies Septic Elimination Program $500,000.00 Orem UT
    Construction Services and Building Supplies Add Right-turn Lanes at 400 South & Orem Boulevard $450,000.00 Orem UT
    Construction Services and Building Supplies Intersection Improvements at University Parkway & 800 East $350,000.00 Orem UT
    Construction Services and Building Supplies Fiber Optic Installation $300,000.00 Orem UT
    Construction Services and Building Supplies Penstock Secondary Water Line $250,000.00 Orem UT
    Business and Consulting Services ED- For-Profit/Job Creation $2,500,000.00 Orem UT
    Business and Consulting Services Business Incubator $2,000,000.00 Orem UT
    Construction Services and Building Supplies New community recreation center $25,000,000.00 Provo UT
    Construction Services and Building Supplies Partial funding for 200 West railroad $20,000,000.00 Provo UT
    Construction Services and Building Supplies 48" Aqueduct from Mouth of Provo Canyon to Main Reservoirs $10,381,000.00 Provo UT
    Construction Services and Building Supplies New trunk line from Wastewater Treatment Plant across I-15 $10,000,000.00 Provo UT
    Construction Services and Building Supplies New 5 MG Water Reservoir $5,500,000.00 Provo UT
    Construction Services and Building SuppliesAutomatic Meter Reading $4,275,000.00 Provo UT
    Construction Services and Building Supplies New airport ramp $4,000,000.00 Provo UT
    Construction Services and Building Supplies Additional Mountain Vista Business Park Infrastructure $2,500,000.00 Provo UT
    Construction Services and Building Supplies Lighting and Fencing Upgrades $2,500,000.00 Provo UT
    Construction Services and Building Supplies Reconstruct broken-down concrete planters on Center Street in the CBD $2,500,000.00 Provo UT
    Construction Services and Building Supplies Sidewalk replacement in Pioneer $2,000,000.00 Provo UT
    Construction Services and Building Supplies Solids Handling Facility Upgrade - Wastewater Treatment Plant $2,000,000.00 Provo UT
    Construction Services and Building Supplies Downtown Parking Infrastructure $1,800,000.00 Provo UT
    Construction Services and Building Supplies Methane Capture at SUVSWD Landfill $1,800,000.00 Provo UT
    Construction Services and Building Supplies Railroad Quiet Zone Improvements $1,250,000.00 Provo UT
    Construction Services and Building Supplies Water Maintenance Facility Repairs, Efficiency Upgrade & Solar Roof $1,250,000.00 Provo UT
    Construction Services and Building Supplies 10" Gravity Sewer Lines to West Center Street Lift Station $1,010,800.00 Provo UT
    Construction Services and Building Supplies Drainage Improvements at Provo $1,000,000.00 Provo UT
    Construction Services and Building Supplies Energy Upgrades for Housing Authority Owned Properties $1,000,000.00 Provo UT
    Construction Services and Building Supplies Creation of Westside Pressure Zone - Install PRV Stations $825,000.00 Provo UT
    Construction Services and Building Supplies Joaquin Park improvements $800,000.00 Provo UT
    Construction Services and Building Supplies Rock Canyon Well and Pump House $700,000.00 Provo UT
    Construction Services and Building Supplies Police department indoor gun range with noise attenuation $663,500.00 Provo UT
    Construction Services and Building Supplies Pioneer Park water feature $650,000.00 Provo UT
    Construction Services and Building Supplies West Center Street Sewer Lift Station $500,000.00 Provo UT
    Construction Services and Building Supplies 2550 West Sewer Interceptor $480,444.00 Provo UT
    Construction Services and Building Supplies New community center for the Boulders/Franklin South neighborhood $400,000.00 Provo UT
    Construction Services and Building Supplies Paul Reams Wilderness Park $350,000.00 Provo UT
    Construction Services and Building Supplies Center Street sprinkling system $300,000.00 Provo UT
    Construction Services and Building Supplies North Park/Timp Ball Park $300,000.00 Provo UT
    Construction Services and Building Supplies 8" Force Main from West Center St. Lift Station to Gravity Sewer $275,600.00 Provo UT
    Construction Services and Building Supplies 100 North street-sidewalk-street treestreet light improvements in the CBD $250,000.00 Provo UT
    Construction Services and Building Supplies Camelot Sewer Line $216,000.00 Provo UT
    Construction Services and Building Supplies Exchange Park Improvements $200,000.00 Provo UT
    Construction Services and Building Supplies Riverside Park Improvements $200,000.00 Provo UT
    Construction Services and Building Supplies Harmon Park Improvements $150,000.00 Provo UT
    Construction Services and Building Supplies North Park/Pioneer Museum Parking $150,000.00 Provo UT
    Construction Services and Building Supplies Southeast Reservoir Drain Line $135,000.00 Provo UT
    Construction Services and Building Supplies Regional Wastewater Treatment Plant $250,000,000.00 Salem UT
    Construction Services and Building Supplies Regional Wastewater Transmission Line $50,000,000.00 Salem UT
    Construction Services and Building Supplies Recreation Complex $20,000,000.00 Salem UT
    Construction Services and Building Supplies Storm Drain System $15,000,000.00 Salem UT
    Construction Services and Building Supplies Industrial Park $5,000,000.00 Salem UT
    Construction Services and Building Supplies Local Road Improvements $5,000,000.00 Salem UT
    Transportation Equipment Prisoner transport van; vehicle and 4 $452,000.00 Salt Lake City UT
    Transportation Equipment Salt lake Information Center (SLIC) response vehicle equipped with vehicle based PC, monitors and other $173,000.00 Salt Lake City UT
    Transportation Equipment Prisoner transport seats to be placed in patrol vehicle $100,000.00 Salt Lake City UT
    Operations and Maintenance Services CBRN suit for each employee $1,000,000.00 Salt Lake City UT
    Operations and Maintenance Services Aerial surveillance drone to monitor crowd and event situations; 1 officer $200,000.00 Salt Lake City UT
    Operations and Maintenance Services Night vision and thermal imaging units $120,000.00 Salt Lake City UT
    Operations and Maintenance Services Man portable and EOD response robot. $115,000.00 Salt Lake City UT
    IT / Telecommunications Software program to search, manage and analyze vast amounts of criminal investigation information from wide ranging data sources. Include software program, server, IT support and 2 $836,000.00 Salt Lake City UT
    IT / Telecommunications In-car video system for each patrol vehicle, includes installation $750,000.00 Salt Lake City UT
    IT / Telecommunications Traffic Control Systems for Emergency $400,000.00 Salt Lake City UT
    IT / Telecommunications SPIDR. Use of spherical camera to record critical infrastructure. Information to be available to all officers in times of hostage crisis, barricade, etc. Available via VPN, air $279,000.00 Salt Lake City UT
    IT / Telecommunications License plate reader cars to look for stolen cars; 2 vehicles @ $45,000 each $256,000.00 Salt Lake City UT
    IT / Telecommunications Motion tracking software; camera sensors to notify monitoring employees of suspicious activities. Include 3 $214,000.00 Salt Lake City UT
    IT / Telecommunications Facial recognition on UTA buses, TRAX stations and terminals. 100 cameras, including installation, maintenance and $150,000.00 Salt Lake City UT
    IT / Telecommunications Automatic Vehicle Locator System for Fire Station 14 $90,689.00 Salt Lake City UT
    IT / Telecommunications Purchase of air card for all officers, include setup and maintenance to access critical infrastructure information, receive immediate updates, and ease communication $80,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construct two light rail extensions downtown (400 South extensions to Hub and 700 South/400 West extension) to complete the adopted Downtown Transportation Master Plan $175,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construction of a new streetcar line in southwest downtown connecting the intermodal transportation center with major destinations including a regional park, providing an underpass for the streetcar and major trail under the $100,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Capital asset renewal on City facilities $75,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies 20 MW Geothermal Power Generation $70,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construction of a new light rail North Temple viaduct over Union Pacific and UTA Commuter rail tracks including new roadway improvements, pedestrian walks with security lighting and a passenger transfer station $65,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construct the Sugar House Streetcar line connecting downtown Sugar House to the regional light rail system $55,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies ESCO Energy Conservation Projects All City & County Buildings $30,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Refugee Welcome Housing creation of 175 housing units for refugee population in Salt Lake City $27,255,000.00 Salt Lake City UT
    Construction Services and Building Supplies Water Reclamation Plant Construction Alternative Disinfection system to replace chlorine gas system for public $13,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Fuel Cell Co-Generation Library/City & County Boiler Room $10,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Solar Hot Water and 2MW Photovoltaic $10,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Fire Training Center and rebuild Fire $9,961,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construct 900 South Bicycle and Pedestrian Trail & linear park $8,500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Big Cottonwood Water Treatment Plant Flocculation System rehab and structural/seismic rehabilitation $8,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construct paved trackway on Airport Light Rail project $8,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies City Creek Water Treatment Plant - Phase 2 Seismic Upgrade $6,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construct Folsom Avenue Bicycle and Pedestrian Trail & linear park $6,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Water Reclamation Plant Digester $6,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies New Construction Rendon Terrace, 158 North 600 West (Public Housing) $5,056,000.00 Salt Lake City UT
    Construction Services and Building Supplies Water Distribution System $3,500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Water Maintenance Facility Repairs, Efficiency Upgrade & Solar Roof $3,500,000.00 Salt Lake City UT
    Construction Services and Building Supplies City wide asphalt pavement overlays $3,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Pavement Overlays & Street Preservation 18 streets $3,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies 500 East Reconstruction from 1300 South to 2100 South $2,800,000.00 Salt Lake City UT
    Construction Services and Building Supplies Fire Station 15 new fire station for Southwest Quadrant of SLC $2,600,000.00 Salt Lake City UT
    Construction Services and Building Supplies Intersection traffic signal upgrades 14 intersections $2,400,000.00 Salt Lake City UT
    Construction Services and Building Supplies 48" Sewer Main Corrosion $2,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construct North Temple Bicycle and Pedestrian Trail $2,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Deteriorated Sidewalk Replacement $2,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Replace North Temple Street Lighting $2,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Jordan River trail lighting and construction 5 projects $1,900,000.00 Salt Lake City UT
    Construction Services and Building Supplies 2008/2009 Local Streets Reconst. Project 7 streets (1.87 lane miles) $1,700,000.00 Salt Lake City UT
    Construction Services and Building Supplies 2008/2009 Residential street reconstruction Project 7 streets (1.87 $1,700,000.00 Salt Lake City UT
    Construction Services and Building Supplies 2009/2010 Local Streets Reconst. Project 7 streets (1.87 lane miles) $1,700,000.00 Salt Lake City UT
    Construction Services and Building Supplies 2009/2010 Residential street reconstruction Project 7 streets (1.87 $1,700,000.00 Salt Lake City UT
    Construction Services and Building Supplies Creek Road Water Main Upgrade $1,700,000.00 Salt Lake City UT
    Construction Services and Building Supplies 2007/2008 Residential streets reconstruction not constructed 6 $1,600,000.00 Salt Lake City UT
    Construction Services and Building Supplies Previous Local Streets Reconst. not constructed 6 streets (1.74 L.M.) $1,600,000.00 Salt Lake City UT
    Construction Services and Building Supplies 2009/2010 Pavement Overlay and Preservation 9 streets (7.06 L.M.) $1,500,000.00 Salt Lake City UT
    Construction Services and Building Supplies ADA sidewalk ramp construction $1,500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construct Jordan River Trail Crossing of Union Pacific Railroad mainline $1,500,000.00 Salt Lake City UT
    Construction Services and Building Supplies North Bench Booster Pump Station $1,500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Street Pavement Overlay Project - Previous streets not overlayed 11 $1,500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Water Reclamation Plant Odor Control Facility Rehabilitation $1,500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Water Reclamation Plant Phase 1 Plant SCADA Control and Electrical $1,500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construct Jordan River Trail between Redwood Road and north city limits $1,300,000.00 Salt Lake City UT
    Construction Services and Building Supplies Rotary Glen Park Improvements and $1,300,000.00 Salt Lake City UT
    Construction Services and Building Supplies Water Reclamation Plant Secondary Clarifier Weir and Baffle Rehab $1,250,000.00 Salt Lake City UT
    Construction Services and Building Supplies Grant program for residential energy efficiency projects $1,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Park irrigation system upgrades - 3 $1,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Park restroom improvement projects- Redwood and 1700 South Street parks; Rosewood Park Restroom $1,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Park stairways, sidewalks and ADA access and playgrounds improvements - 4th Avenue stairs, Rosewood Park, Reservoir Park, Shipp Park and Jordan $900,000.00 Salt Lake City UT
    Construction Services and Building Supplies Install new HAWK Pedestrian crossing $800,000.00 Salt Lake City UT
    Construction Services and Building Supplies Install/Replace Traffic Signal Detection at 200 intersections $800,000.00 Salt Lake City UT
    Construction Services and Building Supplies Replace 40+ year street lights citywide using more efficient lights $800,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construct Surplus Canal Bicycle and Pedestrian Trail $750,000.00 Salt Lake City UT
    Construction Services and Building Supplies Water Administration Facility & Energy Efficiently Upgrade $750,000.00 Salt Lake City UT
    Construction Services and Building Supplies Water Reclamation Plant Clarifier Weir and Baffle Reconstruction $750,000.00 Salt Lake City UT
    Construction Services and Building Supplies Baseball diamond viewing stands and concession both upgrades $700,000.00 Salt Lake City UT
    Construction Services and Building Supplies Jordan Meadows Park Construction $700,000.00 Salt Lake City UT
    Construction Services and Building Supplies Park baseball diamonds, stand and concession improvements 2 parks $700,000.00 Salt Lake City UT
    Construction Services and Building Supplies 700 East S. Temple to 700 South - replace street lighting $600,000.00 Salt Lake City UT
    Construction Services and Building Supplies ADA Playground Upgrade 3 parks $600,000.00 Salt Lake City UT
    Construction Services and Building Supplies Concrete Pavement Rehabilitation 2008/2009 Project candidates not $500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Concrete Pavement Rehabilitation 2009/2010 Project candidates not $500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Concrete Pavement Rehabilitation Project Previous not constructed 9 $500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Cottonwood Park irrigation system $500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Replace the City's Traffic Control Center Computer Map $500,000.00 Salt Lake City UT
    Construction Services and Building Supplies Construct Jordan River Train crossing of Inter80 $450,000.00 Salt Lake City UT
    Construction Services and Building Supplies Replace and expand downtown wayfinding signing system $400,000.00 Salt Lake City UT
    Construction Services and Building Supplies Projects UT004 02 & 001 City Plaza, Phillips Plaza, and Romney Plaza (Public $374,000.00 Salt Lake City UT
    Construction Services and Building Supplies Big Cottonwood Water Treatment Plant Computer Control Upgrade & Maintenance Program Upgrade $350,000.00 Salt Lake City UT
    Construction Services and Building Supplies Install remote control system for Sugar House street lighting system $350,000.00 Salt Lake City UT
    Construction Services and Building Supplies Water Reclamation Plant Iron Sponge $350,000.00 Salt Lake City UT
    Construction Services and Building Supplies Water Reclamation Plant Lab Roof and HVAC Replacement $350,000.00 Salt Lake City UT
    Construction Services and Building Supplies 3400 West California Ave and 3800 West California Ave new traffic signals $320,000.00 Salt Lake City UT
    Construction Services and Building Supplies New Soccer Field 1700 South Jordan $300,000.00 Salt Lake City UT
    Construction Services and Building Supplies Big Cottonwood Water Treatment Plant - Filter Valve Rehab $250,000.00 Salt Lake City UT
    Construction Services and Building Supplies Parleys Water Treatment Plant Intake Structure Rehab $250,000.00 Salt Lake City UT
    Construction Services and Building Supplies 600 East 600 South new traffic signal $160,000.00 Salt Lake City UT
    Construction Services and Building Supplies Resurfacing of streets and installation of bicycle lanes $100,000.00 Salt Lake City UT
    Business and Consulting Services Increase bike patrol in area. Add 4 squads, 6 officers and 1 sergeant per $1,964,000.00 Salt Lake City UT
    Business and Consulting Services Increase foot patrol in area. Add 4 squads, 6 officers and 1 sergeant per $1,964,000.00 Salt Lake City UT
    Business and Consulting Services Dedicated DUI squad; 1 sergeant and 6 $950,000.00 Salt Lake City UT
    Business and Consulting Services Crime Prevention Through Environmental Design (CPTED); 2 $286,000.00 Salt Lake City UT
    Business and Consulting Services DNA testing. $4,000 per test and 2 civilian employees to manage. $200,000.00 Salt Lake City UT
    Business and Consulting Services Constant man minimum staffing; overtime funding to call individuals to work; ongoing budget item $130,000.00 Salt Lake City UT
    Architectural and Engineering Services Glass recycling capital investment $5,000,000.00 Salt Lake City UT
    Architectural and Engineering Services Facilities capital project design, engineering, feasibility and $1,000,000.00 Salt Lake City UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 1D 699 $3,000,000.00 Beaver UT
    Construction Services and Building Supplies Asphalt Pavement Rehab $19,450,000.00 Box Elder UT
    Construction Services and Building Supplies Concrete Pavement Rehabilitation $13,000,000.00 Box Elder UT
    Construction Services and Building Supplies Dowel Bar Retrofit, Grinding $9,750,000.00 Box Elder UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0F 24 $3,500,000.00 Box Elder UT
    Construction Services and Building Supplies Underground Drainage & Slope $1,650,000.00 Box Elder UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 1F 168 $1,500,000.00 Box Elder UT
    Construction Services and Building Supplies Bridge Preservation for C 665, F- 169, F- $1,000,000.00 Box Elder UT
    Construction Services and Building Supplies Widening $40,000,000.00 Cache UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0E $3,000,000.00 Cache UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0H $2,500,000.00 Carbon UT
    Construction Services and Building Supplies Mill, Fill & Seal $2,110,000.00 Carbon UT
    Construction Services and Building Supplies Micro Surfacing $540,000.00 Carbon UT
    Construction Services and Building Supplies Bridge Preservation for C 312 $450,000.00 Carbon UT
    Construction Services and Building Supplies Widen to 5 Lanes $478,780,000.00 Carbon & Emery UT
    Construction Services and Building Supplies Widen to 5 Lanes $15,000,000.00 Carbon & Emery UT
    Construction Services and Building Supplies Widening $400,000,000.00 Davis UT
    Construction Services and Building Supplies New Interchange $120,000,000.00 Davis UT
    Construction Services and Building Supplies Roadway Widening $16,200,000.00 Davis UT
    Construction Services and Building Supplies Asphalt Pavement Rehab $15,150,000.00 Davis UT
    Construction Services and Building Supplies Widening $15,000,000.00 Davis UT
    Construction Services and Building Supplies Widening $12,000,000.00 Davis UT
    Construction Services and Building Supplies Extend Auxiliary Lane Full Length $10,000,000.00 Davis UT
    Construction Services and Building Supplies Auxiliary Lanes and Ramp $6,000,000.00 Davis UT
    Construction Services and Building Supplies Interchange Improvements $5,000,000.00 Davis UT
    Construction Services and Building Supplies Bridge Preservation for D 615 $500,000.00 Davis UT
    Construction Services and Building Supplies Bridge Preservation for D 631A, D -631B $500,000.00 Davis UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0F 209 $4,500,000.00 Duchesne UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0C 72 $2,500,000.00 Duchesne UT
    Construction Services and Building Supplies Bridge Preservation for C-560 $2,000,000.00 Duchesne UT
    Construction Services and Building Supplies Passing Lanes $25,000,000.00 Emery UT
    Construction Services and Building Supplies Widening $25,000,000.00 Emery UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for C 144 $7,000,000.00 Emery UT
    Construction Services and Building Supplies Truck Climbing Lanes $6,000,000.00 Emery UT
    Construction Services and Building Supplies Climbing Lane $5,000,000.00 Emery UT
    Construction Services and Building Supplies Passing Lanes $2,000,000.00 Emery UT
    Construction Services and Building Supplies Overlay $845,000.00 Emery UT
    Construction Services and Building Supplies Chip Seal $760,000.00 Garfield UT
    Construction Services and Building Supplies Chip Seal $410,000.00 Garfield UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 2F 284 $4,000,000.00 Grand UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 4F 326 $4,000,000.00 Grand UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 2D 549 $1,500,000.00 Grand UT
    Construction Services and Building Supplies Bridge Preservation for 2F-284 $400,000.00 Grand UT
    Construction Services and Building Supplies Bridge Preservation for 4F-326 $400,000.00 Grand UT
    Construction Services and Building Supplies Bridge Preservation for C-444 $300,000.00 Grand UT
    Construction Services and Building Supplies Overlay $4,000,000.00 Iron UT
    Construction Services and Building Supplies Mill & Overlay $2,380,000.00 Iron UT
    Construction Services and Building Supplies Lane Level & Overlay $3,240,000.00 Kane UT
    Construction Services and Building Supplies Mill & SMA Overlay $6,000,000.00 Millard UT
    Construction Services and Building Supplies Road- Rotomill and Overlay & Structure $4,900,000.00 Morgan/Summit UT
    Construction Services and Building Supplies Corridor Preservation / New $720,000,000.00 Salt Lake UT
    Construction Services and Building Supplies Road Rotomill and Overlay $16,780,000.00 Salt Lake UT
    Construction Services and Building Supplies Auxiliary Lanes and Ramp $15,000,000.00 Salt Lake UT
    Construction Services and Building Supplies Road Concrete Rehab & Grind $8,425,000.00 Salt Lake UT
    Construction Services and Building Supplies Road Rotomill and Overlay $7,295,000.00 Salt Lake UT
    Construction Services and Building Supplies Road- Rotomill and Overlay $7,050,000.00 Salt Lake UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 2F 51 $7,000,000.00 Salt Lake UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 4F 51 $7,000,000.00 Salt Lake UT
    Construction Services and Building Supplies Rotomill and Overlay $5,600,000.00 Salt Lake UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for0F 580 $5,000,000.00 Salt Lake UT
    Construction Services and Building Supplies Road Rotomill and Overlay $4,000,000.00 Salt Lake UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 2C 371 $3,750,000.00 Salt Lake UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 4C 371 $3,750,000.00 Salt Lake UT
    Construction Services and Building Supplies Bridge Preservation forC-633, C-637, F- 419, C-558, 1C-460, C-709 $2,650,000.00 Salt Lake UT
    Construction Services and Building Supplies Road Rotomill and Overlay $1,945,000.00 Salt Lake UT
    Construction Services and Building Supplies Bridge Preservation for F-7 $400,000.00 Salt Lake UT
    Construction Services and Building Supplies Bridge Preservation for 1C-664 $300,000.00 Salt Lake UT
    Construction Services and Building Supplies Bridge Preservation for E-2544, E-2545, E-2546, E-2547 $300,000.00 Salt Lake UT
    Construction Services and Building Supplies Bridge Preservation for F-48 $300,000.00 Salt Lake UT
    Construction Services and Building Supplies Bridge Preservation for C-585 $200,000.00 Salt Lake UT
    Construction Services and Building Supplies New Construction $2,150,000,000.00 Salt Lake & Utah UT
    Construction Services and Building Supplies Bangerter Highway to American Fork Interchange (Phase Two) $1,382,000,000.00 Salt Lake & Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0D 710 $6,000,000.00 San Juan UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for0C 292 $1,250,000.00 San Juan UT
    Construction Services and Building Supplies Micro-Surfacing $648,000.00 San Juan UT
    Construction Services and Building Supplies Bridge Preservation forC-292 $300,000.00 San Juan UT
    Construction Services and Building Supplies Mill & Overlay $650,000.00 San Pete UT
    Construction Services and Building Supplies JHC Project- Rehab $2,270,000.00 Sanpete UT
    Construction Services and Building Supplies Lane Level & Overlay $1,620,000.00 Sevier UT
    Construction Services and Building Supplies Joint & Slab Replacement $1,300,000.00 Sevier UT
    Construction Services and Building Supplies Rotomill and Overlay $14,800,000.00 Summit UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 2C 326 $9,000,000.00 Summit UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 2F 20 $7,650,000.00 Summit UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 4F 20 $7,650,000.00 Summit UT
    Construction Services and Building Supplies Road Microsurfacing $6,760,000.00 Summit UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 2D 743 $6,500,000.00 Summit UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 4D 743 $6,500,000.00 Summit UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 2F 81 $6,000,000.00 Summit UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 4F 81 $6,000,000.00 Summit UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 2D 783 $750,000.00 Summit UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 4D 783 $750,000.00 Summit UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for $1,500,000.00 Uintah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0D 801 $1,500,000.00 Uintah UT
    Construction Services and Building Supplies Widen to 5 Lanes $478,780,000.00 Utah UT
    Construction Services and Building Supplies New Construction $200,000,000.00 Utah UT
    Construction Services and Building Supplies Corridor Preservation / New $130,000,000.00 Utah UT
    Construction Services and Building Supplies Widening $118,000,000.00 Utah UT
    Construction Services and Building Supplies Widen to 5 Lanes $19,440,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0F 84 $8,000,000.00 Utah UT
    Construction Services and Building Supplies Rotomill & Overlay, OGSC $6,480,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 4D 149 $6,000,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 3C 341 $5,000,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 1F 129 $2,000,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 1F 130 $2,000,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 3F 129 $2,000,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 3F 130 $2,000,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0D 322 $1,500,000.00 Utah UT
    Construction Services and Building Supplies Micro-surface $1,100,000.00 Utah UT
    Construction Services and Building Supplies Bridge Preservation for F-84 $1,000,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0C 464 $1,000,000.00 Utah UT
    Construction Services and Building Supplies Bridge Preservation for F-528, F-698, F- 487, F-488, C-728 $600,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0C 623 $500,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0F 11 $500,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 2F 261 $500,000.00 Utah UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 4F 261 $500,000.00 Utah UT
    Construction Services and Building Supplies Bridge Preservation for F-128 $425,000.00 Utah UT
    Construction Services and Building Supplies Bridge Preservation for F-733 $200,000.00 Utah UT
    Construction Services and Building Supplies American Fork Interchange to US- 6 $2,600,000,000.00 Utah & Juab UT
    Construction Services and Building Supplies US-6 to Santaquin (Phase Three) $982,000,000.00 Utah & Juab UT
    Construction Services and Building Supplies Rotomill & Overlay, OGSC $6,480,000.00 Wasatch UT
    Construction Services and Building Supplies New Construction $200,000,000.00 Washington UT
    Construction Services and Building Supplies New Construction $175,000,000.00 Washington UT
    Construction Services and Building Supplies New Construction $125,000,000.00 Washington UT
    Construction Services and Building Supplies New Interchange $73,400,000.00 Washington UT
    Construction Services and Building Supplies New Construction $50,000,000.00 Washington UT
    Construction Services and Building Supplies SMA Overlay $3,750,000.00 Washington UT
    Construction Services and Building Supplies Mill & SMA Overlay $3,650,000.00 Washington UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for053035V $2,000,000.00 Washington UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0C 279 $2,000,000.00 Wayne UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 0D 583 $850,000.00 Wayne UT
    Construction Services and Building Supplies Chip Seal $760,000.00 Wayne/Sevier UT
    Construction Services and Building Supplies New Construction $25,000,000.00 Weber UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for0C 453 $15,000,000.00 Weber UT
    Construction Services and Building Supplies Asphalt Pavement Rehab $12,850,000.00 Weber UT
    Construction Services and Building Supplies Asphalt Pavement Rehab $10,800,000.00 Weber UT
    Construction Services and Building Supplies Bridge Rehab/Replacement for 2C 457 $4,000,000.00 Weber UT
    Construction Services and Building Supplies Bridge Preservation for F63, F- 66 $1,000,000.00 Weber UT
    Construction Services and Building Supplies Bridge Preservation for 1 & 3F- 2 $450,000.00 Weber UT
    Construction Services and Building Supplies I-15 Projects (7) $5,000,000,000.00 UT
    Construction Services and Building Supplies Mountain View Corridor (3) $3,060,000,000.00 UT
    Construction Services and Building Supplies Transit/Rail Projects (11) $2,208,000,000.00 UT
    Construction Services and Building Supplies Critical Highway Needs Fund Projects $1,140,400,000.00 UT
    Construction Services and Building Supplies US-6 Corridor (6) $999,220,000.00 UT
    Construction Services and Building Supplies Southern Parkway (4) $550,000,000.00 UT
    Construction Services and Building Supplies Capacity Projects (8) $474,350,000.00 UT
    Construction Services and Building Supplies Pavement Preservation Projects (38) $308,253,000.00 UT
    Construction Services and Building Supplies New Federal Courthouse $211,000,000.00 UT
    Construction Services and Building Supplies 800 North to I-15 AF Interchange $200,000,000.00 UT
    Construction Services and Building Supplies Major Bridge Rehab/Replacement (47) $177,400,000.00 UT
    Construction Services and Building Supplies N/S Salt Lake County (Mountain View $160,000,000.00 UT
    Construction Services and Building Supplies E/W Connection in Utah County (Mountain View Corridor) $130,000,000.00 UT
    Construction Services and Building Supplies I-15 to Highland $118,000,000.00 UT
    Construction Services and Building Supplies I-15: Dixie Drive Interchange $73,400,000.00 UT
    Construction Services and Building Supplies SR-108 from Syracuse Road Northerly $70,000,000.00 UT
    Construction Services and Building Supplies Water Loan Projects (18) $69,148,000.00 UT
    Construction Services and Building Supplies I-15: South Layton Interchange at Fort $65,000,000.00 UT
    Construction Services and Building Supplies SR-154 Bangerter at 7800 South $47,000,000.00 UT
    Construction Services and Building Supplies Logan/Cache County (SR-252: 10th $40,000,000.00 UT
    Construction Services and Building Supplies 2 New Veterans Nursing Homes $36,000,000.00 UT
    Construction Services and Building Supplies Geneva Rd: Provo Center St. / I-15 to Orem 1600 North $34,500,000.00 UT
    Construction Services and Building Supplies Ogden Court House $27,016,000.00 UT
    Construction Services and Building Supplies SR-126 to Midland Drive (Hinckley Drive Extension) $25,000,000.00 UT
    Construction Services and Building Supplies SR-201 Bangerter Hwy to 5600 W $25,000,000.00 UT
    Construction Services and Building Supplies Southern Parkway: 4300 West to SR-9 $24,000,000.00 UT
    Construction Services and Building Supplies Gunnison Prison, Pod #2 $22,840,000.00 UT
    Construction Services and Building Supplies MATC Building $20,800,000.00 UT
    Construction Services and Building Supplies Hinckley Drive to SR-108 $20,000,000.00 UT
    Construction Services and Building Supplies North Legacy Parkway EIS $20,000,000.00 UT
    Construction Services and Building Supplies Willard sewer treatment system $17,600,000.00 UT
    Construction Services and Building Supplies 1400 W to Main St. Logan (realign 200 $15,000,000.00 UT
    Construction Services and Building Supplies I-15 SB; 7200 So to 9000 So. $15,000,000.00 UT
    Construction Services and Building Supplies SR-10 Horseshoe Dugway to Carbon $15,000,000.00 UT
    Construction Services and Building Supplies SR-108 (Syracuse Rd) 1000 W to 2000 $15,000,000.00 UT
    Construction Services and Building Supplies US-6 MP 218.7 to Emma Park $15,000,000.00 UT
    Construction Services and Building Supplies SR-71: 700 East to 12300 South to $14,733,000.00 UT
    Construction Services and Building Supplies SR-9; 300 West to 800 North Hurricane $14,550,000.00 UT
    Construction Services and Building Supplies Bridge Preservation Projects (21) $13,675,000.00 UT
    Construction Services and Building Supplies SR-212; Telegraph Street in Washington $13,000,000.00 UT
    Construction Services and Building Supplies 700 East: 11400 South to Carnation $12,767,000.00 UT
    Construction Services and Building Supplies SR-10 South of Emery to Muddy Creek $12,500,000.00 UT
    Construction Services and Building Supplies SR-68 (500 South): Redwood Rd/Legacy Parkway to I-15 $12,000,000.00 UT
    Construction Services and Building Supplies Perry sewer treatment system $11,600,000.00 UT
    Construction Services and Building Supplies 500 West to Parrish Lane (NB) $10,000,000.00 UT
    Construction Services and Building Supplies Central Weber Sewer Improvement $10,000,000.00 UT
    Construction Services and Building Supplies US-89: Street: 2000 North in Orem to Geneva Road $9,290,000.00 UT
    Construction Services and Building Supplies Southern Utah University $7,000,000.00 UT
    Construction Services and Building Supplies SR-198: Spanish Fork Main Street, Fairgrounds to Arrowhead $7,000,000.00 UT
    Construction Services and Building Supplies SR-89 (Street) 9000 to 6400 South $7,000,000.00 UT
    Construction Services and Building Supplies US-189; Heber to Provo Canyon $7,000,000.00 UT
    Construction Services and Building Supplies Weber $7,000,000.00 UT
    Construction Services and Building Supplies I-15; SR-108 to SR-193 $6,000,000.00 UT
    Construction Services and Building Supplies US-6; MP 266.50 TO 267.90 $6,000,000.00 UT
    Construction Services and Building Supplies Buildings $5,300,000.00 UT
    Construction Services and Building Supplies I-15; SR-97 & SR103 (Hill Air Force $5,000,000.00 UT
    Construction Services and Building Supplies SR-10: Ridge Road to South Price $5,000,000.00 UT
    Construction Services and Building Supplies SR-140; 146000 South and D&RGW Railroad Structure $5,000,000.00 UT
    Construction Services and Building Supplies SR-193 Interchange and US- 89 to $5,000,000.00 UT
    Construction Services and Building Supplies US-89; Salina to Centerfield $5,000,000.00 UT
    Construction Services and Building Supplies US-191; Over Colorado River Bridge $4,850,000.00 UT
    Construction Services and Building Supplies US-40; Roosevelt Intersection $4,000,000.00 UT
    Construction Services and Building Supplies SR-265; University Parkway @ 2230 $3,990,000.00 UT
    Construction Services and Building Supplies CNG Vehicle Fueling Sites $3,920,000.00 UT
    Construction Services and Building Supplies 6200 South/Redwood Road/I- 215 $3,500,000.00 UT
    Construction Services and Building Supplies Central Valley Water Reclamation $3,000,000.00 UT
    Construction Services and Building Supplies SR-10 Quitchupah Hill Climbing Lane $2,500,000.00 UT
    Construction Services and Building Supplies Salt Lake Community College $2,400,000.00 UT
    Construction Services and Building Supplies Ogden Veterans Nursing Homes $2,000,000.00 UT
    Construction Services and Building Supplies US-6 MP 274 to Woodside $2,000,000.00 UT
    Construction Services and Building Supplies US-6; MP 274 to Woodside Junction $1,500,000.00 UT
    Construction Services and Building Supplies Utah Valley University $1,500,000.00 UT
    Construction Services and Building Supplies I-15; Dixie Drive Interchange $1,000,000.00 UT
    Construction Services and Building Supplies Southern Parkway: New Airport through Warner Valley $1,000,000.00 UT
    Construction Services and Building Supplies Utah Valley Connector (Utah Lake) $1,000,000.00 UT
    Construction Services and Building Supplies Virgin River Gorge project $300,000.00 UT
    Construction Services and Building Supplies Scott Matheson Water Enhancement $175,000.00 UT
    Construction Services and Building Supplies US-89: Street: Pleasant Grove Boulevard to 100 East $5,000.00 UT
    Construction Services and Building Supplies I-15 Core (Utah County) $2,600.00 UT
    Business and Consulting Services Planning Loan/Grants $385,750.00 UT

    Source: Onvia, 3/16/09


  • SOLVING PROBLEMS - CREATING OPPORTUNITIES
  • BONNEVILLE RESEARCH

    Bonneville Research is a regional consulting firm focused on consulting services to state and local governments and private companies seeking winning strategies and achieving impressive results.

    Services include economic analysis for real estate development, public-policy analysis, tourism and economic development

    Since its founding in 1976, Bonneville Research has completed assignments throughout the intermountain west yielding unmatched experience in high quality public policy analysis and economic analysis.

    Helping Clients Succeed

    Our services include:

    • Financial Analysis
    • Business License Studies
    • Impact Fee analysis
    • Urban Renewal & Redevelopment Analysis and Budgets
    • Strategy and Policy Analysis
    • Economic and Fiscal Impact Analysis
    • Statistical and Survey Research
    • Public Sector Mission Effectiveness

    Each of our studies is tailored to address the unique needs of our clients and their communities.

    Successful client work requires a superior team of outstanding people working fluidly together.

    Bonneville Research is the one firm with the experience and expertise to help businesses, governments and nonprofit organizations solve their toughest problems.

    We work to help clients achieve enduring results and improve the communities in which we live.


    If we can help, please call or email us at:

    • Bob
      • 801-364-5300
      • BobSpring@BonnevilleResearch.com
    • Jon
      • 801-746-5706
      • JonSpring@BonnevilleResearch.com

    Bonneville Research

    :: 801-364-5300

    Email Marketing by